A platform for research: civil engineering, architecture and urbanism
Collimation pile double-layer steel sleeve verticality adjusting device, verticality adjusting method and construction method
The invention relates to a collimation pile double-layer steel sleeve perpendicularity adjusting device, perpendicularity adjusting method and construction method, and belongs to the technical field of collimation piles.The collimation pile double-layer steel sleeve perpendicularity adjusting device comprises a cross-shaped top beam, a plurality of double-spliced hanging rods, a cross-shaped hanging frame, a plumb bob, an acrylic plate and a height adjusting piece, the cross-shaped top beam is used for being hoisted on a hoisting device, and the cross-shaped hanging frame is arranged on the cross-shaped top beam; the cross-shaped top beam supporting legs are arranged on the cross-shaped top beam, the two-spliced hanging rods are located on the lower portions of the cross-shaped top beam supporting legs respectively, the two-spliced hanging rods are arranged in the circumferential direction of the axis of the cross-shaped top beam, the steel sleeve is connected to the two-spliced hanging rods in a hung mode, the acrylic plate is provided with a plurality of concentric circles and fixedly arranged at the bottom of the steel sleeve, and the circle centers of the concentric circles on the acrylic plate are coaxial with the steel sleeve. The cross-shaped hanging frame is located at the top of the inner sleeve, the plumb bob is hung at the bottom of the cross-shaped hanging frame and located at the axis of the cross-shaped hanging frame, and the height adjusting piece is located below the cross-shaped top beam supporting leg and used for adjusting the height of the cross-shaped top beam supporting leg. The method has the effect of improving the forming quality of the collimation pile.
本申请涉及一种准直桩双层钢套筒调垂装置、调垂方法及施工方法,属于准直桩技术领域,包括十字顶梁、双拼挂杆、十字挂架、铅锤、亚克力板和高度调节件,所述十字顶梁用于吊装在吊装装置上,所述双拼挂杆设置有多个,且分别位于十字顶梁支腿下部,所述双拼挂杆沿十字顶梁的轴线周向排布,所述钢套筒挂接在双拼挂杆上,所述亚克力板上开设有多个同心圆且固定设置在钢套筒底部,所述亚克力板上同心圆的圆心与钢套筒同轴,所述十字挂架位于内套筒顶部,所述铅锤吊装在十字挂架底部且位于十字挂架轴心处,所述高度调节件位于十字顶梁支腿下方且用于调节十字顶梁支腿高度。本申请具有提高准直桩成型质量的效果。
Collimation pile double-layer steel sleeve verticality adjusting device, verticality adjusting method and construction method
The invention relates to a collimation pile double-layer steel sleeve perpendicularity adjusting device, perpendicularity adjusting method and construction method, and belongs to the technical field of collimation piles.The collimation pile double-layer steel sleeve perpendicularity adjusting device comprises a cross-shaped top beam, a plurality of double-spliced hanging rods, a cross-shaped hanging frame, a plumb bob, an acrylic plate and a height adjusting piece, the cross-shaped top beam is used for being hoisted on a hoisting device, and the cross-shaped hanging frame is arranged on the cross-shaped top beam; the cross-shaped top beam supporting legs are arranged on the cross-shaped top beam, the two-spliced hanging rods are located on the lower portions of the cross-shaped top beam supporting legs respectively, the two-spliced hanging rods are arranged in the circumferential direction of the axis of the cross-shaped top beam, the steel sleeve is connected to the two-spliced hanging rods in a hung mode, the acrylic plate is provided with a plurality of concentric circles and fixedly arranged at the bottom of the steel sleeve, and the circle centers of the concentric circles on the acrylic plate are coaxial with the steel sleeve. The cross-shaped hanging frame is located at the top of the inner sleeve, the plumb bob is hung at the bottom of the cross-shaped hanging frame and located at the axis of the cross-shaped hanging frame, and the height adjusting piece is located below the cross-shaped top beam supporting leg and used for adjusting the height of the cross-shaped top beam supporting leg. The method has the effect of improving the forming quality of the collimation pile.
本申请涉及一种准直桩双层钢套筒调垂装置、调垂方法及施工方法,属于准直桩技术领域,包括十字顶梁、双拼挂杆、十字挂架、铅锤、亚克力板和高度调节件,所述十字顶梁用于吊装在吊装装置上,所述双拼挂杆设置有多个,且分别位于十字顶梁支腿下部,所述双拼挂杆沿十字顶梁的轴线周向排布,所述钢套筒挂接在双拼挂杆上,所述亚克力板上开设有多个同心圆且固定设置在钢套筒底部,所述亚克力板上同心圆的圆心与钢套筒同轴,所述十字挂架位于内套筒顶部,所述铅锤吊装在十字挂架底部且位于十字挂架轴心处,所述高度调节件位于十字顶梁支腿下方且用于调节十字顶梁支腿高度。本申请具有提高准直桩成型质量的效果。
Collimation pile double-layer steel sleeve verticality adjusting device, verticality adjusting method and construction method
一种准直桩双层钢套筒调垂装置、调垂方法及施工方法
SHEN YANG (author) / GONG WEIDONG (author) / ZI XIANG (author) / WANG JUN (author) / ZHANG MENGEN (author)
2024-11-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile positioning verticality adjusting equipment and pile mounting construction method
European Patent Office | 2024
|Embedded steel column verticality adjusting system and construction method thereof
European Patent Office | 2022
|