Construction technology of assembly type automobile ramp
The invention belongs to the field of construction of automobile ramps, in particular to a construction process of an assembly type automobile ramp, and aims to solve the problems of long construction period and high labor cost and measure cost in the prior art, the construction process comprises the following steps: S1, all components are processed into single components in a steel structure processing factory, and rust removal primer, intermediate paint and finish paint are prepared on the surfaces of the single components; s2, the steel casting is plugged into a single component, and assembling is completed; s3, adopting a soft plastic film for full packaging; according to the method, the construction method of machining plant cutting machining and on-site splicing is adopted, the construction speed is short and smooth, the construction period is greatly shortened, the construction cost is greatly reduced, the situations of dust raising and ozone can be effectively reduced, the environment is protected, primary and secondary keels are adopted for connection through pins, and construction is convenient and fast.
本发明属于汽车坡道的构造领域,尤其是一种装配式汽车坡道的构造工艺,针对现有的施工周期长,人工成本、措施成本高的问题,现提出如下方案,其包括以下步骤:S1、所有构件在钢结构加工厂加工成单根构件,表面做好除锈底漆、中漆、面漆;S2、钢铸件塞进单根构件组装完成;S3、采取软塑料膜进行全包装;S4、发到现场根据图纸逐次拼接,制得汽车坡道,本发明采取加工厂切割加工,现场拼装的构造做法,施工速率短平快,大大降低施工周期和施工成本,也能有效减去扬尘及臭氧的情况,保护环境,采取主次龙骨采取销钉连接,施工便捷。
Construction technology of assembly type automobile ramp
The invention belongs to the field of construction of automobile ramps, in particular to a construction process of an assembly type automobile ramp, and aims to solve the problems of long construction period and high labor cost and measure cost in the prior art, the construction process comprises the following steps: S1, all components are processed into single components in a steel structure processing factory, and rust removal primer, intermediate paint and finish paint are prepared on the surfaces of the single components; s2, the steel casting is plugged into a single component, and assembling is completed; s3, adopting a soft plastic film for full packaging; according to the method, the construction method of machining plant cutting machining and on-site splicing is adopted, the construction speed is short and smooth, the construction period is greatly shortened, the construction cost is greatly reduced, the situations of dust raising and ozone can be effectively reduced, the environment is protected, primary and secondary keels are adopted for connection through pins, and construction is convenient and fast.
本发明属于汽车坡道的构造领域,尤其是一种装配式汽车坡道的构造工艺,针对现有的施工周期长,人工成本、措施成本高的问题,现提出如下方案,其包括以下步骤:S1、所有构件在钢结构加工厂加工成单根构件,表面做好除锈底漆、中漆、面漆;S2、钢铸件塞进单根构件组装完成;S3、采取软塑料膜进行全包装;S4、发到现场根据图纸逐次拼接,制得汽车坡道,本发明采取加工厂切割加工,现场拼装的构造做法,施工速率短平快,大大降低施工周期和施工成本,也能有效减去扬尘及臭氧的情况,保护环境,采取主次龙骨采取销钉连接,施工便捷。
Construction technology of assembly type automobile ramp
一种装配式汽车坡道的构造工艺
CHANG HUWEI (author) / CHANG MENG (author) / XU FUSEN (author) / CHANG YINLONG (author) / GENG LIBO (author)
2022-05-27
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Automobile ramp dismantling construction method and lifting assembly framework and method thereof
European Patent Office | 2023
|Automobile ramp assembly type steel structure anti-collapse shed frame and design method thereof
European Patent Office | 2023
|