Rapid assembly and disassembly construction method for horizontal cantilever net of high-altitude cantilever outer frame
The invention provides a construction method for quickly assembling and disassembling a horizontal overhanging net of a high-altitude overhanging outer frame. The construction method comprises the steps of assembling the horizontal overhanging net, hoisting the horizontal overhanging net, fixing the horizontal overhanging net, disassembling the horizontal overhanging net and the like. In the construction process, an operator can achieve rapid assembly and disassembly construction, risks are avoided, meanwhile, labor input is reduced, the safety construction requirement is met, the high-altitude falling risk is effectively prevented, operation is very convenient, disassembly and recycling can be achieved after use, the recycling rate reaches 100%, the use cost is extremely low, the safety protection measure cost is greatly reduced, and the safety protection effect is good. The economic and technical benefits are obvious.
本发明提供一种高空悬挑外架水平挑网快速装拆施工方法,包括水平挑网组装、水平挑网吊装、水平挑网固定、水平挑网拆除等步骤。本发明在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。
Rapid assembly and disassembly construction method for horizontal cantilever net of high-altitude cantilever outer frame
The invention provides a construction method for quickly assembling and disassembling a horizontal overhanging net of a high-altitude overhanging outer frame. The construction method comprises the steps of assembling the horizontal overhanging net, hoisting the horizontal overhanging net, fixing the horizontal overhanging net, disassembling the horizontal overhanging net and the like. In the construction process, an operator can achieve rapid assembly and disassembly construction, risks are avoided, meanwhile, labor input is reduced, the safety construction requirement is met, the high-altitude falling risk is effectively prevented, operation is very convenient, disassembly and recycling can be achieved after use, the recycling rate reaches 100%, the use cost is extremely low, the safety protection measure cost is greatly reduced, and the safety protection effect is good. The economic and technical benefits are obvious.
本发明提供一种高空悬挑外架水平挑网快速装拆施工方法,包括水平挑网组装、水平挑网吊装、水平挑网固定、水平挑网拆除等步骤。本发明在施工过程中,作业人员能够实现快速装拆施工,规避风险的同时,减少了劳动力的投入,满足安全施工要求,有效预防高空坠落风险,且操作十分方便,使用完即可拆解回收,回收利用率达到100%,使用成本极低,大大减少了安全防护措施费用,经济、技术效益显著。
Rapid assembly and disassembly construction method for horizontal cantilever net of high-altitude cantilever outer frame
一种高空悬挑外架水平挑网快速装拆施工方法
DOU LIN (author) / JING LAIFA (author) / LI PING (author) / XIONG WEI (author) / ZHENG ZHENXIE (author) / MEI JIANGTAO (author)
2022-05-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
High-altitude tie-free cantilever outer frame structure and construction method thereof
European Patent Office | 2023
|Connecting construction method of cantilever outer frame
European Patent Office | 2022
|Movable cantilever frame for high-altitude construction of constructional engineering
European Patent Office | 2023
|