The invention relates to the technical field of wharf loading transformation, in particular to a loading wharf transformation method. The loading wharf transformation method comprises the following steps that an existing bridge deck with the set width between two bridge piers in the transverse bridge direction is dismantled; a rack is erected between every two piers in the longitudinal bridge direction, and the height of the construction face of each rack and the height of a cross beam between every two piers in the transverse bridge direction differ by a set distance; and track beams are poured on the construction face of the rack and the cross beams. According to the scheme, the problem that in the prior art, an existing bridge is directly transformed, and a track arranged on a bridge deck cannot meet the load requirements of trains and traction locomotives can be solved.
本发明涉及码头装载改造技术领域,具体涉及一种装载码头改造方法。该装载码头改造方法包括以下步骤:拆除横桥向两个桥墩之间设定宽度的既有桥面;在纵桥向每两个桥墩之间搭设台架,并使所述台架的施工面高度与横桥向两个所述桥墩之间横梁的高度相差设定距离;在所述台架的施工面和所述横梁上浇筑轨道梁。本方案能够解决现有技术中直接改造现有的桥梁,在桥面上设置轨道无法适应火车及牵引机车的荷载要求的问题。
Loading wharf transformation method
The invention relates to the technical field of wharf loading transformation, in particular to a loading wharf transformation method. The loading wharf transformation method comprises the following steps that an existing bridge deck with the set width between two bridge piers in the transverse bridge direction is dismantled; a rack is erected between every two piers in the longitudinal bridge direction, and the height of the construction face of each rack and the height of a cross beam between every two piers in the transverse bridge direction differ by a set distance; and track beams are poured on the construction face of the rack and the cross beams. According to the scheme, the problem that in the prior art, an existing bridge is directly transformed, and a track arranged on a bridge deck cannot meet the load requirements of trains and traction locomotives can be solved.
本发明涉及码头装载改造技术领域,具体涉及一种装载码头改造方法。该装载码头改造方法包括以下步骤:拆除横桥向两个桥墩之间设定宽度的既有桥面;在纵桥向每两个桥墩之间搭设台架,并使所述台架的施工面高度与横桥向两个所述桥墩之间横梁的高度相差设定距离;在所述台架的施工面和所述横梁上浇筑轨道梁。本方案能够解决现有技术中直接改造现有的桥梁,在桥面上设置轨道无法适应火车及牵引机车的荷载要求的问题。
Loading wharf transformation method
一种装载码头改造方法
WANG YALONG (author) / CHEN YANGYANG (author) / XIAO NAN (author) / WANG JIE (author) / MA XIAODONG (author) / LOU SONG (author) / ZHAO DELIN (author) / XU AN (author) / WEI QINGSONG (author) / JU WANG (author)
2022-05-31
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Wharf transformation structure and wharf transformation construction method
European Patent Office | 2015
|Extreme Loading of Wharf Crane Girders
British Library Conference Proceedings | 2010
|Extreme Loading of Wharf Crane Girders
ASCE | 2010
|European Patent Office | 2024
|