A platform for research: civil engineering, architecture and urbanism
The invention relates to a house building basement waterproof structure and a construction method, and relates to the field of house construction.The house building basement waterproof structure comprises a top plate, side walls and a bottom plate, flow guide pipes are installed in the side walls, water guide pipes are arranged at the joints of the side walls and the bottom plate, and the water guide pipes are connected with the flow guide pipes; a fixing assembly is arranged between the water guide pipe and the flow guide pipe; a plurality of flexible parts are wound at the connecting position of the flow guide pipe and the water guide pipe, the flexible parts are filled with lime powder, a plurality of detection holes are formed in the inner side walls, facing the water guide pipe or the flow guide pipe, of the flexible parts, and the flow guide pipe is sleeved with a sleeve; a reserved hole is preset in the side wall, a through hole is formed in the peripheral wall, close to the top end, of the sleeve, a temperature measuring piece is inserted into the detection hole in the side wall, and the temperature measuring piece sequentially penetrates through the reserved hole and the through hole and then extends into the sleeve. The device has the effect of detecting whether the connection position of the flow guide pipe and the water guide pipe leaks water or not, operation is easy, and construction efficiency is greatly improved.
本申请涉及一种房屋建筑地下室防水结构及施工方法,涉及房屋建筑的领域,房屋建筑地下室防水结构包括顶板、侧墙以及底板,侧墙内安装有导流管,侧墙与底板交接处设置有导水管,导水管与导流管连接,导水管与导流管之间设置有固定组件;导流管与导水管连接位置缠绕有多个柔性件,柔性件内填充有石灰粉,且柔性件朝向导水管或导流管的内侧壁开设有若干个检测孔,导流管外套设有套筒;侧墙预设有预留孔,套筒靠近于顶端的周壁开设有穿孔,侧墙于检测孔内插接有测温件,测温件依次穿过预留孔以及穿孔后伸入至套筒内。本申请具有检测导流管与导水管连接位置是否漏水的效果,操作简单,大大提升施工效率。
The invention relates to a house building basement waterproof structure and a construction method, and relates to the field of house construction.The house building basement waterproof structure comprises a top plate, side walls and a bottom plate, flow guide pipes are installed in the side walls, water guide pipes are arranged at the joints of the side walls and the bottom plate, and the water guide pipes are connected with the flow guide pipes; a fixing assembly is arranged between the water guide pipe and the flow guide pipe; a plurality of flexible parts are wound at the connecting position of the flow guide pipe and the water guide pipe, the flexible parts are filled with lime powder, a plurality of detection holes are formed in the inner side walls, facing the water guide pipe or the flow guide pipe, of the flexible parts, and the flow guide pipe is sleeved with a sleeve; a reserved hole is preset in the side wall, a through hole is formed in the peripheral wall, close to the top end, of the sleeve, a temperature measuring piece is inserted into the detection hole in the side wall, and the temperature measuring piece sequentially penetrates through the reserved hole and the through hole and then extends into the sleeve. The device has the effect of detecting whether the connection position of the flow guide pipe and the water guide pipe leaks water or not, operation is easy, and construction efficiency is greatly improved.
本申请涉及一种房屋建筑地下室防水结构及施工方法,涉及房屋建筑的领域,房屋建筑地下室防水结构包括顶板、侧墙以及底板,侧墙内安装有导流管,侧墙与底板交接处设置有导水管,导水管与导流管连接,导水管与导流管之间设置有固定组件;导流管与导水管连接位置缠绕有多个柔性件,柔性件内填充有石灰粉,且柔性件朝向导水管或导流管的内侧壁开设有若干个检测孔,导流管外套设有套筒;侧墙预设有预留孔,套筒靠近于顶端的周壁开设有穿孔,侧墙于检测孔内插接有测温件,测温件依次穿过预留孔以及穿孔后伸入至套筒内。本申请具有检测导流管与导水管连接位置是否漏水的效果,操作简单,大大提升施工效率。
House building basement waterproof structure and construction method
房屋建筑地下室防水结构及施工方法
CHENG HAI (author)
2022-06-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
House building basement waterproof structure and construction method
European Patent Office | 2020
|House building basement waterproof structure and construction method
European Patent Office | 2022
|Waterproof construction method for basement of house building
European Patent Office | 2023
|