A platform for research: civil engineering, architecture and urbanism
Suspended ceiling structure and construction method thereof
The invention provides a suspended ceiling structure and a construction method thereof, and relates to the technical field of indoor decoration. The hanger is arranged at the bottom end of the hanger rod; the main keel is connected with the hanging rod through a hanging piece; the connecting assembly is arranged at the bottom of the main keel, and the auxiliary keel is connected with the main keel through the connecting assembly; a connecting port is formed in the bottom of the main keel; strip-shaped through holes are formed in the two sides of the auxiliary keels. The connecting assembly comprises a plurality of inverted claws arranged from top to bottom, a main shaft arranged at the bottoms of the inverted claws, a rotating shaft arranged at the bottom of the main shaft and fixing columns arranged on the two sides of the rotating shaft. The inverted claw is clamped on the connecting port, and the fixing column is clamped in the strip-shaped through hole. The keel can be quickly mounted and dismounted, so that the working procedure can be simplified, and the working efficiency can be improved.
本发明提供一种天花板吊顶结构及其施工方法,涉及室内装饰技术领域,所述天花板吊顶结构包括吊杆;设置在吊杆底端的吊件;通过吊件与吊杆连接的主龙骨;设置在主龙骨底部的连接组件,通过连接组件与主龙骨连接的副龙骨;所述主龙骨底部设置有连接口;所述副龙骨两侧设置有条形通孔;所述连接组件包括从上到下设置的若干倒爪,设置在倒爪底部的主轴,设置在主轴底部的转轴,设置在转轴两侧的固定柱;所述倒爪卡接在连接口上,所述固定柱卡接在条形通孔内。本发明能够实现龙骨的快速安装与拆卸,从而可以简化工序,提高工作效率。
Suspended ceiling structure and construction method thereof
The invention provides a suspended ceiling structure and a construction method thereof, and relates to the technical field of indoor decoration. The hanger is arranged at the bottom end of the hanger rod; the main keel is connected with the hanging rod through a hanging piece; the connecting assembly is arranged at the bottom of the main keel, and the auxiliary keel is connected with the main keel through the connecting assembly; a connecting port is formed in the bottom of the main keel; strip-shaped through holes are formed in the two sides of the auxiliary keels. The connecting assembly comprises a plurality of inverted claws arranged from top to bottom, a main shaft arranged at the bottoms of the inverted claws, a rotating shaft arranged at the bottom of the main shaft and fixing columns arranged on the two sides of the rotating shaft. The inverted claw is clamped on the connecting port, and the fixing column is clamped in the strip-shaped through hole. The keel can be quickly mounted and dismounted, so that the working procedure can be simplified, and the working efficiency can be improved.
本发明提供一种天花板吊顶结构及其施工方法,涉及室内装饰技术领域,所述天花板吊顶结构包括吊杆;设置在吊杆底端的吊件;通过吊件与吊杆连接的主龙骨;设置在主龙骨底部的连接组件,通过连接组件与主龙骨连接的副龙骨;所述主龙骨底部设置有连接口;所述副龙骨两侧设置有条形通孔;所述连接组件包括从上到下设置的若干倒爪,设置在倒爪底部的主轴,设置在主轴底部的转轴,设置在转轴两侧的固定柱;所述倒爪卡接在连接口上,所述固定柱卡接在条形通孔内。本发明能够实现龙骨的快速安装与拆卸,从而可以简化工序,提高工作效率。
Suspended ceiling structure and construction method thereof
一种天花板吊顶结构及其施工方法
XIAO JIANYE (author)
2022-06-03
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
SUSPENDED CEILING STRUCTURE AND SUSPENDED CEILING CONSTRUCTION METHOD
European Patent Office | 2015
|Suspended ceiling module, suspended ceiling system and construction method thereof
European Patent Office | 2020
|Suspended ceiling structure and construction method thereof
European Patent Office | 2023
|Indoor suspended ceiling structure and construction method thereof
European Patent Office | 2020
|CONSTRUCTION METHOD OF SUSPENDED CEILING AND SUSPENDED CEILING
European Patent Office | 2015
|