Underwater pile foundation mud auxiliary device and construction method
The invention discloses an underwater pile foundation mud construction auxiliary device and a construction method. The underwater pile foundation mud construction auxiliary device comprises a pile foundation horizontal positioning mechanism, and the pile foundation horizontal positioning mechanism is provided with a steel casing formed by bending a steel plate with the thickness of 4 mm and a positioning rod installed on the steel casing; the steel casing positioning guide frame is built on the periphery of the steel casing so as to keep the position of the steel casing; the pile foundation horizontal positioning mechanism comprises two steel pile casings, namely an inner pile casing and an outer pile casing; the system positions the horizontal position of the pile foundation through the pile foundation horizontal positioning mechanism. According to the device, the mode that the double-layer steel pile casing is used for casing driving, and the inner pile casing is used for fixing and stopping water through underwater concrete is adopted, so that the sealing performance and stability are guaranteed; the adjacent pile steel casing is used as a temporary mud pit for mud circulation, so that discharge is reduced, and the environmental protection benefit is good; the horizontal positioning auxiliary device is adopted for horizontal positioning of the pile foundation steel casing, the pile foundation drilling construction precision is improved, and deviation is prevented.
本发明公开了一种水下桩基泥浆施工辅助装置及施工方法,包括桩基水平定位机构,所述桩基水平定位机构具有通过4mm厚的钢板弯制而成的钢护筒,以及安装于所述钢护筒的定位杆;以及钢护筒定位导向架,所述钢护筒定位导向架搭建于所述钢护筒外周以保持所述钢护筒的位置;所述桩基水平定位机构包括两个钢护筒,分别为内护筒和外护筒;该系统通过所述桩基水平定位机构定位桩基水平位置。本发明的装置采用双层钢护筒套打、内护筒水下混凝土固定止水的方式,保证了其密封性和稳定性;采用临桩钢护筒充当临时泥浆池,进行泥浆循环,减少外排,环保效益好;采用水平定位辅助装置进行桩基钢护筒水平定位,提高桩基钻孔施工精度,防止偏位。
Underwater pile foundation mud auxiliary device and construction method
The invention discloses an underwater pile foundation mud construction auxiliary device and a construction method. The underwater pile foundation mud construction auxiliary device comprises a pile foundation horizontal positioning mechanism, and the pile foundation horizontal positioning mechanism is provided with a steel casing formed by bending a steel plate with the thickness of 4 mm and a positioning rod installed on the steel casing; the steel casing positioning guide frame is built on the periphery of the steel casing so as to keep the position of the steel casing; the pile foundation horizontal positioning mechanism comprises two steel pile casings, namely an inner pile casing and an outer pile casing; the system positions the horizontal position of the pile foundation through the pile foundation horizontal positioning mechanism. According to the device, the mode that the double-layer steel pile casing is used for casing driving, and the inner pile casing is used for fixing and stopping water through underwater concrete is adopted, so that the sealing performance and stability are guaranteed; the adjacent pile steel casing is used as a temporary mud pit for mud circulation, so that discharge is reduced, and the environmental protection benefit is good; the horizontal positioning auxiliary device is adopted for horizontal positioning of the pile foundation steel casing, the pile foundation drilling construction precision is improved, and deviation is prevented.
本发明公开了一种水下桩基泥浆施工辅助装置及施工方法,包括桩基水平定位机构,所述桩基水平定位机构具有通过4mm厚的钢板弯制而成的钢护筒,以及安装于所述钢护筒的定位杆;以及钢护筒定位导向架,所述钢护筒定位导向架搭建于所述钢护筒外周以保持所述钢护筒的位置;所述桩基水平定位机构包括两个钢护筒,分别为内护筒和外护筒;该系统通过所述桩基水平定位机构定位桩基水平位置。本发明的装置采用双层钢护筒套打、内护筒水下混凝土固定止水的方式,保证了其密封性和稳定性;采用临桩钢护筒充当临时泥浆池,进行泥浆循环,减少外排,环保效益好;采用水平定位辅助装置进行桩基钢护筒水平定位,提高桩基钻孔施工精度,防止偏位。
Underwater pile foundation mud auxiliary device and construction method
水下桩基泥浆辅助装置及施工方法
CHEN LIGUANG (author) / ZHAO SHENGWU (author) / JIANG YONG (author) / YU YILIN (author) / LI XIN (author) / LI TONG (author) / MA HENGCHONG (author) / LI SUOHUI (author) / WANG QIQIAN (author)
2022-06-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Foundation pile auxiliary equipment and foundation pile construction method
European Patent Office | 2022
|CONSTRUCTION METHOD FOR UNDERWATER PIPE PILE FOUNDATION AND UNDERWATER PIPE PILE FOUNDATION
European Patent Office | 2023
|Pile foundation construction auxiliary device for foundation engineering
European Patent Office | 2023
|