A platform for research: civil engineering, architecture and urbanism
Whole bathroom prefabricated room
The invention relates to an integral bathroom prefabricated room, and belongs to the technical field of building construction. Some embodiments of the invention provide an integral bathroom prefabricated room which comprises a base plate and four side walls, and the base plate and the four side walls are enclosed to form a five-surface integrated structure; the four side walls comprise template walls and partition walls; the formwork wall is made of ultra-high performance concrete materials, and the formwork wall serves as an inner side formwork and is used for being matched with an outer side formwork so as to form a pouring space used for pouring the shear wall. The whole wall of the formwork wall serves as an inner side formwork and is made of ultra-high performance concrete materials without steel bar structures, so that the formwork wall is small in thickness, light in weight and small in material consumption on the premise that the strength requirement is met, the step of hooking and connecting steel bars in the process of pouring and forming the shear wall is omitted, manufacturing procedures are reduced, and construction efficiency is improved.
本申请涉及一种整体卫浴预制间,属于建筑施工技术领域。本申请的一些实施例提出一种整体卫浴预制间,包括:底盘和四个侧壁,所述底盘和所述四个侧壁围合形成五面一体结构;所述四个侧壁包括模板墙和隔墙;所述模板墙为超高性能混凝土材质,所述模板墙作为内侧模板,用于与外部的外侧模板配合,以形成用于浇注剪力墙的浇注空间。模板墙整面墙作为内侧模板,且为无钢筋构造的超高性能混凝土材质,使模板墙在满足强度要求的前提下厚度薄,重量轻,耗用材料少,且省去了在浇注形成剪力墙过程中将钢筋钩挂相连的步骤,减少了制造工序,提高了施工效率。
Whole bathroom prefabricated room
The invention relates to an integral bathroom prefabricated room, and belongs to the technical field of building construction. Some embodiments of the invention provide an integral bathroom prefabricated room which comprises a base plate and four side walls, and the base plate and the four side walls are enclosed to form a five-surface integrated structure; the four side walls comprise template walls and partition walls; the formwork wall is made of ultra-high performance concrete materials, and the formwork wall serves as an inner side formwork and is used for being matched with an outer side formwork so as to form a pouring space used for pouring the shear wall. The whole wall of the formwork wall serves as an inner side formwork and is made of ultra-high performance concrete materials without steel bar structures, so that the formwork wall is small in thickness, light in weight and small in material consumption on the premise that the strength requirement is met, the step of hooking and connecting steel bars in the process of pouring and forming the shear wall is omitted, manufacturing procedures are reduced, and construction efficiency is improved.
本申请涉及一种整体卫浴预制间,属于建筑施工技术领域。本申请的一些实施例提出一种整体卫浴预制间,包括:底盘和四个侧壁,所述底盘和所述四个侧壁围合形成五面一体结构;所述四个侧壁包括模板墙和隔墙;所述模板墙为超高性能混凝土材质,所述模板墙作为内侧模板,用于与外部的外侧模板配合,以形成用于浇注剪力墙的浇注空间。模板墙整面墙作为内侧模板,且为无钢筋构造的超高性能混凝土材质,使模板墙在满足强度要求的前提下厚度薄,重量轻,耗用材料少,且省去了在浇注形成剪力墙过程中将钢筋钩挂相连的步骤,减少了制造工序,提高了施工效率。
Whole bathroom prefabricated room
整体卫浴预制间
2022-06-14
Patent
Electronic Resource
Chinese