Construction method of temporary cargo cable
The invention belongs to the field of cargo cable construction, and particularly relates to a construction method of a temporary cargo cable, which comprises the following steps of: S1, preparing before construction, manufacturing temporary cableway equipment, pouring concrete into a next station anchoring pit after the manufacturing is finished, and measuring and paying off after the pouring is finished; s2, a temporary cableway support foundation is leveled, anchoring parts are buried, temporary cableway equipment and needed materials are manually transported to a designated position, and then a temporary support is erected and a saddle is installed; s3, a bearing cable is laid, equipment manufacturing of the temporary cableway is completed, and the bearing cable is anchored and fixed on the upper station and the lower station; compared with a traditional one-way temporary cableway, the cableway has the advantages that the two bearing cables of the cableway can be used for transporting goods, the goods transporting efficiency is greatly improved, infrastructures are simple, and goods transportation can be completed under various complex conditions.
本发明属于货索施工领域,具体的说是一种临时货索的施工方法,该临时货索的施工方法按照以下步骤进行施工:S1:首先进行施工前的准备,进行临时索道设备的制作,制作完成以后,对下站锚固坑进行混凝土浇注,浇注完成以后测量放线;S2:平整临时索道支架基础,并进行锚固件的埋设,人工将临时索道设备以及所需的材料运输到指定位置,然后进行临时支架的架设以及鞍座的安装;S3:承载索敷设,完成临时索道的设备制作,将承载索上下站进行锚固固定;能够实现双向运输,相比于传统的单向式临时索道,该种索道两根承载索均可以运输货物,运输货物的效率大大提高,基础设施简单,能够在各种复杂的情况下完成货物的运输。
Construction method of temporary cargo cable
The invention belongs to the field of cargo cable construction, and particularly relates to a construction method of a temporary cargo cable, which comprises the following steps of: S1, preparing before construction, manufacturing temporary cableway equipment, pouring concrete into a next station anchoring pit after the manufacturing is finished, and measuring and paying off after the pouring is finished; s2, a temporary cableway support foundation is leveled, anchoring parts are buried, temporary cableway equipment and needed materials are manually transported to a designated position, and then a temporary support is erected and a saddle is installed; s3, a bearing cable is laid, equipment manufacturing of the temporary cableway is completed, and the bearing cable is anchored and fixed on the upper station and the lower station; compared with a traditional one-way temporary cableway, the cableway has the advantages that the two bearing cables of the cableway can be used for transporting goods, the goods transporting efficiency is greatly improved, infrastructures are simple, and goods transportation can be completed under various complex conditions.
本发明属于货索施工领域,具体的说是一种临时货索的施工方法,该临时货索的施工方法按照以下步骤进行施工:S1:首先进行施工前的准备,进行临时索道设备的制作,制作完成以后,对下站锚固坑进行混凝土浇注,浇注完成以后测量放线;S2:平整临时索道支架基础,并进行锚固件的埋设,人工将临时索道设备以及所需的材料运输到指定位置,然后进行临时支架的架设以及鞍座的安装;S3:承载索敷设,完成临时索道的设备制作,将承载索上下站进行锚固固定;能够实现双向运输,相比于传统的单向式临时索道,该种索道两根承载索均可以运输货物,运输货物的效率大大提高,基础设施简单,能够在各种复杂的情况下完成货物的运输。
Construction method of temporary cargo cable
一种临时货索的施工方法
ZHENG CHENGHUI (author) / CHU XULIANG (author) / WANG FUWEI (author)
2022-06-17
Patent
Electronic Resource
Chinese
Rotatable temporary construction for cargo containment system
European Patent Office | 2018
|Rotatable temporary construction for cargo containment system
European Patent Office | 2018
TEMPORARY PLACING TABLE AND POWER CABLE TERMINAL END CONSTRUCTION METHOD
European Patent Office | 2016
|European Patent Office | 2021
|