Temporary water supply pipe and temporary power main cable shear wall pre-burying construction method
The invention discloses a temporary water supply pipe and a temporary power main cable shear wall pre-burying construction method. The temporary water supply pipe comprises a shear wall, and a function pipe is arranged in the shear wall; the construction method of the shear wall comprises vertical shear wall pouring and horizontal shear wall pouring; an external connection pipe is arranged in the shear wall, the external connection pipe communicates with the function pipe and is used for taking water, a stainless steel wire head is detached, a faucet is installed, and then water can be taken; and a water supply pipeline is pre-buried in the shear wall, water can be freely taken on each layer, a water taking pipeline does not need to be additionally pulled, the building construction site is simplified, meanwhile, the water pipeline is protected and is not damaged, a distribution box is arranged on the wall face of the shear wall, the distribution box is electrically connected with a main cable in the function pipe, the complex wire pulling problem is avoided, electricity of floors can be taken through the distribution box, electric wire materials are saved, meanwhile, the electricity safety problem can be managed, and the phenomena that cable pulling connection is in disorder and cables are prone to being damaged are prevented.
本发明公开了一种临时给水管、临电主线缆剪力墙预埋的施工方法,包括剪力墙,所述剪力墙的内部设置有功能管,所述剪力墙的施工方法分为竖直剪力墙浇筑和水平剪力墙浇筑。该剪力墙的内部均设置有外接管,外接管与功能管连通,用于取水,拆卸掉不锈钢丝头,安装上水龙头即可取水,在剪力墙内部预埋给水管路,在每一层均可以自由取水,不需要额外拉设取水管路,简洁了建筑施工现场,同时保护了水管管路,不受损坏,剪力墙的墙面设置有配电箱,配电箱与功能管内部的主电缆电性连接,避免了繁杂的拉线问题,楼层的用电均可以通过配电箱来接取,节约电线材料,同时有利于管理用电安全问题,防止线缆拉接凌乱和易破损现象。
Temporary water supply pipe and temporary power main cable shear wall pre-burying construction method
The invention discloses a temporary water supply pipe and a temporary power main cable shear wall pre-burying construction method. The temporary water supply pipe comprises a shear wall, and a function pipe is arranged in the shear wall; the construction method of the shear wall comprises vertical shear wall pouring and horizontal shear wall pouring; an external connection pipe is arranged in the shear wall, the external connection pipe communicates with the function pipe and is used for taking water, a stainless steel wire head is detached, a faucet is installed, and then water can be taken; and a water supply pipeline is pre-buried in the shear wall, water can be freely taken on each layer, a water taking pipeline does not need to be additionally pulled, the building construction site is simplified, meanwhile, the water pipeline is protected and is not damaged, a distribution box is arranged on the wall face of the shear wall, the distribution box is electrically connected with a main cable in the function pipe, the complex wire pulling problem is avoided, electricity of floors can be taken through the distribution box, electric wire materials are saved, meanwhile, the electricity safety problem can be managed, and the phenomena that cable pulling connection is in disorder and cables are prone to being damaged are prevented.
本发明公开了一种临时给水管、临电主线缆剪力墙预埋的施工方法,包括剪力墙,所述剪力墙的内部设置有功能管,所述剪力墙的施工方法分为竖直剪力墙浇筑和水平剪力墙浇筑。该剪力墙的内部均设置有外接管,外接管与功能管连通,用于取水,拆卸掉不锈钢丝头,安装上水龙头即可取水,在剪力墙内部预埋给水管路,在每一层均可以自由取水,不需要额外拉设取水管路,简洁了建筑施工现场,同时保护了水管管路,不受损坏,剪力墙的墙面设置有配电箱,配电箱与功能管内部的主电缆电性连接,避免了繁杂的拉线问题,楼层的用电均可以通过配电箱来接取,节约电线材料,同时有利于管理用电安全问题,防止线缆拉接凌乱和易破损现象。
Temporary water supply pipe and temporary power main cable shear wall pre-burying construction method
一种临时给水管、临电主线缆剪力墙预埋的施工方法
FENG YONGCHUAN (author) / LI SHUANZHU (author) / CHEN LIPING (author) / ZHOU YING (author) / LI WEIZHOU (author) / WANG LONG (author) / NIU TIANZENG (author) / HAN LINA (author) / XU HONGHAI (author) / WAN QIONG (author)
2021-06-11
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Temporary power utilization cable bracket and temporary enclosing wall
European Patent Office | 2020
|