Bottom plate heat preservation ceiling and integrated construction method thereof
The invention provides a bottom plate heat preservation ceiling and an integrated construction method thereof. The integrated construction method for the bottom plate, the heat preservation and the ceiling comprises the following steps that S1, after a top plate formwork is laid, a heat preservation layer subjected to net hanging, plastering and facing treatment is laid in the mode that heat preservation nails face upwards according to the size of a top plate; s2, an isolation layer is laid on the heat preservation layer, and heat preservation nails of the heat preservation layer penetrate through the isolation layer; and S3, plate face steel bars are laid on the isolation layer, concrete pouring is conducted after the heat preservation nails and the plate face steel bars are firmly bound, and forming is conducted after formwork removal. According to the integrated construction method for the bottom plate heat preservation ceiling, the problems of construction period delay, large labor amount and the like caused by multiple working procedures and multiple cross operations in an existing construction method can be solved.
本发明提供了一种底板保温顶棚及其一体化施工方法。本发明的底板保温顶棚一体化施工方法,包括如下步骤:S1:顶板模板铺设完成后,根据顶板大小尺寸将经挂网、抹灰、饰面处理后的保温层以保温钉朝上的方式铺设好;S2:在保温层上铺设隔离层,保温层的保温钉穿过隔离层;S3:在隔离层上铺设板面钢筋,将保温钉与板面钢筋绑扎牢固后进行混凝土浇筑,拆模后成型。本发明的底板保温顶棚一体化施工方法能够避免现有施工方法因工序多、交叉作业多造成的延误工期、用工量大等问题。
Bottom plate heat preservation ceiling and integrated construction method thereof
The invention provides a bottom plate heat preservation ceiling and an integrated construction method thereof. The integrated construction method for the bottom plate, the heat preservation and the ceiling comprises the following steps that S1, after a top plate formwork is laid, a heat preservation layer subjected to net hanging, plastering and facing treatment is laid in the mode that heat preservation nails face upwards according to the size of a top plate; s2, an isolation layer is laid on the heat preservation layer, and heat preservation nails of the heat preservation layer penetrate through the isolation layer; and S3, plate face steel bars are laid on the isolation layer, concrete pouring is conducted after the heat preservation nails and the plate face steel bars are firmly bound, and forming is conducted after formwork removal. According to the integrated construction method for the bottom plate heat preservation ceiling, the problems of construction period delay, large labor amount and the like caused by multiple working procedures and multiple cross operations in an existing construction method can be solved.
本发明提供了一种底板保温顶棚及其一体化施工方法。本发明的底板保温顶棚一体化施工方法,包括如下步骤:S1:顶板模板铺设完成后,根据顶板大小尺寸将经挂网、抹灰、饰面处理后的保温层以保温钉朝上的方式铺设好;S2:在保温层上铺设隔离层,保温层的保温钉穿过隔离层;S3:在隔离层上铺设板面钢筋,将保温钉与板面钢筋绑扎牢固后进行混凝土浇筑,拆模后成型。本发明的底板保温顶棚一体化施工方法能够避免现有施工方法因工序多、交叉作业多造成的延误工期、用工量大等问题。
Bottom plate heat preservation ceiling and integrated construction method thereof
一种底板保温顶棚及其一体化施工方法
WANG JINLONG (author) / MEI XIAOLI (author) / ZHANG LIANG (author) / ZONG TINGBO (author) / AI YONG (author) / WANG GUOYUAN (author) / ZHAO CHUNYING (author) / WANG YUXIN (author)
2022-06-24
Patent
Electronic Resource
Chinese
Integrated construction method for thermal insulation bottom plate and ceiling
European Patent Office | 2023
|Plate combination unit for heat preservation suspended ceiling
European Patent Office | 2024
|Steel structure truss plate bottom heat preservation construction structure
European Patent Office | 2024
|Plate bottom heat preservation and facing composite structure and construction method
European Patent Office | 2023
|