Water conservancy construction pipe pile installation construction technology
The invention belongs to the field of pipe pile construction, particularly relates to a water conservancy construction pipe pile installation construction technology, and provides the following scheme aiming at the problems that in existing pipe pile construction, the construction process cannot be previewed firstly, and a construction scheme cannot be reasonably optimized, so that problems often occur in the construction process, and the construction period is delayed. The method comprises the following steps that S1, a geological layer of a construction area is surveyed, a soil layer is analyzed, analysis and judgment are conducted according to big data, the bearing capacity of the soil layer is analyzed, and the position and depth of a pipe pile are determined; s2, 3D modeling is conducted on the construction area, a construction site model is established, and the position of a pipe pile is marked; and S3, the construction process is simulated, previewed, comprehensively analyzed and optimized in the 3D model. According to the method, the position and depth of the pipe pile can be reasonably determined, the construction process can be optimized, a final construction scheme can be determined, errors can be effectively avoided, and the pipe pile can be prevented from being damaged.
本发明属于管桩施工领域,尤其是一种水利施工管桩安装施工工艺,针对现有的管桩施工时不能先对施工过程进行预览,不能对施工方案进行合理优化,导致施工时经常会出现问题,拖延了工期问题,现提出如下方案,其包括以下步骤:S1:对施工区域地质层进行勘测,并对土层进行分析,按照大数据进行分析判断,分析土层的承受力,确定管桩位置及深度;S2:对施工区域进行3D建模,建立施工现场模型,标记出管桩位置;S3:在3D模型中对施工过程进行模拟,预览施工过程,进行综合分析,优化施工过程,本发明能够合理的确定管桩位置及深度,可以优化施工过程,确定最终的施工方案,可以有效的避免出现差错,可以避免损坏管桩。
Water conservancy construction pipe pile installation construction technology
The invention belongs to the field of pipe pile construction, particularly relates to a water conservancy construction pipe pile installation construction technology, and provides the following scheme aiming at the problems that in existing pipe pile construction, the construction process cannot be previewed firstly, and a construction scheme cannot be reasonably optimized, so that problems often occur in the construction process, and the construction period is delayed. The method comprises the following steps that S1, a geological layer of a construction area is surveyed, a soil layer is analyzed, analysis and judgment are conducted according to big data, the bearing capacity of the soil layer is analyzed, and the position and depth of a pipe pile are determined; s2, 3D modeling is conducted on the construction area, a construction site model is established, and the position of a pipe pile is marked; and S3, the construction process is simulated, previewed, comprehensively analyzed and optimized in the 3D model. According to the method, the position and depth of the pipe pile can be reasonably determined, the construction process can be optimized, a final construction scheme can be determined, errors can be effectively avoided, and the pipe pile can be prevented from being damaged.
本发明属于管桩施工领域,尤其是一种水利施工管桩安装施工工艺,针对现有的管桩施工时不能先对施工过程进行预览,不能对施工方案进行合理优化,导致施工时经常会出现问题,拖延了工期问题,现提出如下方案,其包括以下步骤:S1:对施工区域地质层进行勘测,并对土层进行分析,按照大数据进行分析判断,分析土层的承受力,确定管桩位置及深度;S2:对施工区域进行3D建模,建立施工现场模型,标记出管桩位置;S3:在3D模型中对施工过程进行模拟,预览施工过程,进行综合分析,优化施工过程,本发明能够合理的确定管桩位置及深度,可以优化施工过程,确定最终的施工方案,可以有效的避免出现差错,可以避免损坏管桩。
Water conservancy construction pipe pile installation construction technology
一种水利施工管桩安装施工工艺
2022-06-28
Patent
Electronic Resource
Chinese
Water conservancy construction concrete pipe pile installation method
European Patent Office | 2021
|Water conservancy construction pile head treatment method
European Patent Office | 2021
|Water conservancy sewage engineering cement culvert pipe installation and construction method
European Patent Office | 2021
|Pile foundation fixing structure for water conservancy construction
European Patent Office | 2022
|Pile foundation structure for water conservancy construction engineering
European Patent Office | 2023
|