A platform for research: civil engineering, architecture and urbanism
The invention relates to a water conservancy construction concrete pipe pile installation method. The installation method involves a supporting device, an alignment sleeve, first discharging devices and second discharging devices, wherein the alignment sleeve is fixedly connected to the middle of the supporting device, the first discharging devices are symmetrically arranged at the position, closeto the upper end, of the supporting device, and second discharging devices are symmetrically mounted below the first discharging devices. According to the method, the problems that in the vertical hoisting process of a concrete pipe pile, a steel wire rope is used for fixing and limiting the concrete pipe pile, the pipe pile is hammered into a pile position through piling equipment, in the pilingprocess, constructors need to continuously trim and adjust the pipe pile to ensure that the pipe pile is always perpendicular to the foundation soil surface, so that the operation is very tedious, time-consuming and labor-consuming, and the pipe pile mounting efficiency is low, when the foundation soil surface has a certain gradient, the perpendicularity of the pipe pile and the foundation soil surface cannot be guaranteed by constructors, so that the mounting efficiency of the pipe pile is influenced, and the construction quality of the pipe pile is poor.
本发明涉及一种水利施工混凝土管桩安装方法,包括支撑装置、对位套管、第一落料装置和第二落料装置,所述的支撑装置的中部固定连接有对位套管,支撑装置上靠近上端的位置对称设置有第一落料装置,第一落料装置的下方对称安装有第二落料装置。本发明可以解决在混凝土管桩竖直吊起的过程中,利用钢丝绳索对其进行固定限位,通过打桩设备将管桩锤入桩位,在打桩过程中需要施工人员不断修整、调节管桩以保证管桩和基土面始终垂直,十分繁琐,费时费力,导致管桩安装效率低下;当基土面具有一定的坡度时,通过施工人员无法保证管桩和基土面的垂直度,从而影响了管桩的安装效率,导致管桩的施工质量较差等难题。
The invention relates to a water conservancy construction concrete pipe pile installation method. The installation method involves a supporting device, an alignment sleeve, first discharging devices and second discharging devices, wherein the alignment sleeve is fixedly connected to the middle of the supporting device, the first discharging devices are symmetrically arranged at the position, closeto the upper end, of the supporting device, and second discharging devices are symmetrically mounted below the first discharging devices. According to the method, the problems that in the vertical hoisting process of a concrete pipe pile, a steel wire rope is used for fixing and limiting the concrete pipe pile, the pipe pile is hammered into a pile position through piling equipment, in the pilingprocess, constructors need to continuously trim and adjust the pipe pile to ensure that the pipe pile is always perpendicular to the foundation soil surface, so that the operation is very tedious, time-consuming and labor-consuming, and the pipe pile mounting efficiency is low, when the foundation soil surface has a certain gradient, the perpendicularity of the pipe pile and the foundation soil surface cannot be guaranteed by constructors, so that the mounting efficiency of the pipe pile is influenced, and the construction quality of the pipe pile is poor.
本发明涉及一种水利施工混凝土管桩安装方法,包括支撑装置、对位套管、第一落料装置和第二落料装置,所述的支撑装置的中部固定连接有对位套管,支撑装置上靠近上端的位置对称设置有第一落料装置,第一落料装置的下方对称安装有第二落料装置。本发明可以解决在混凝土管桩竖直吊起的过程中,利用钢丝绳索对其进行固定限位,通过打桩设备将管桩锤入桩位,在打桩过程中需要施工人员不断修整、调节管桩以保证管桩和基土面始终垂直,十分繁琐,费时费力,导致管桩安装效率低下;当基土面具有一定的坡度时,通过施工人员无法保证管桩和基土面的垂直度,从而影响了管桩的安装效率,导致管桩的施工质量较差等难题。
Water conservancy construction concrete pipe pile installation method
一种水利施工混凝土管桩安装方法
2021-02-26
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Water conservancy construction pipe pile installation construction technology
European Patent Office | 2022
|Prestressed concrete pipe pile installation construction reinforcing method
European Patent Office | 2021
|Concrete pipe pile construction and installation process
European Patent Office | 2021
|Water conservancy sewage engineering cement culvert pipe installation and construction method
European Patent Office | 2021
|Water conservancy construction pile head treatment method
European Patent Office | 2021
|