Plugging process for reserved hole in concrete outer wall of building
The invention discloses a blocking process for a reserved hole in a concrete outer wall of a building. The blocking process comprises the following steps that preparation is conducted, the reserved hole is formed in a wall body, a tongue-and-groove is formed in the front end of the reserved hole, then a prefabricated plate is manufactured, a plurality of inhaul cables are arranged on the prefabricated plate, and in addition, a sealing plate is manufactured; mounting and reinforcing are conducted, the prefabricated plate is embedded into the tongue-and-groove in a matched mode so that the prefabricated plate can block the front end of the reserved hole, the rear end of the reserved hole is covered with a sealing plate, an inhaul cable on the prefabricated plate penetrates through the sealing plate and is connected with a back ridge, the back ridge abuts against the sealing plate, and a sprue gate is formed between the sealing plate and the rear end of the reserved hole; pouring is conducted, specifically, concrete is poured from the pouring opening, and the reserved hole is filled with the concrete; and dismantling: dismantling the sealing plate after final setting of the concrete, chiseling away redundant concrete at the position of the sprue gate, repairing and polishing, and watering and maintaining for 14 days.
本发明公开了一种用于建筑物混凝土外墙预留孔洞的封堵工艺,包括下列步骤:准备,在墙体上设置预留孔洞,在预留孔洞的前端设置企口,再制作一块预制板,预制板上设置若干拉索,此外再制作一块封板;安装加固,将预制板配合嵌入企口,使预制板能够封堵预留孔洞的前端,将封板盖在预留孔洞的后端,将预制板上的拉索穿过封板并连接背楞,使背楞抵靠在封板上,封板与预留孔洞的后端之间设置有浇注口;浇注,从浇注口中浇注混凝土,使混凝土将预留孔洞填充;拆除,混凝土终凝后拆除封板,凿除浇注口位置多余的混凝土,并进行修补打磨,洒水养护十四天。
Plugging process for reserved hole in concrete outer wall of building
The invention discloses a blocking process for a reserved hole in a concrete outer wall of a building. The blocking process comprises the following steps that preparation is conducted, the reserved hole is formed in a wall body, a tongue-and-groove is formed in the front end of the reserved hole, then a prefabricated plate is manufactured, a plurality of inhaul cables are arranged on the prefabricated plate, and in addition, a sealing plate is manufactured; mounting and reinforcing are conducted, the prefabricated plate is embedded into the tongue-and-groove in a matched mode so that the prefabricated plate can block the front end of the reserved hole, the rear end of the reserved hole is covered with a sealing plate, an inhaul cable on the prefabricated plate penetrates through the sealing plate and is connected with a back ridge, the back ridge abuts against the sealing plate, and a sprue gate is formed between the sealing plate and the rear end of the reserved hole; pouring is conducted, specifically, concrete is poured from the pouring opening, and the reserved hole is filled with the concrete; and dismantling: dismantling the sealing plate after final setting of the concrete, chiseling away redundant concrete at the position of the sprue gate, repairing and polishing, and watering and maintaining for 14 days.
本发明公开了一种用于建筑物混凝土外墙预留孔洞的封堵工艺,包括下列步骤:准备,在墙体上设置预留孔洞,在预留孔洞的前端设置企口,再制作一块预制板,预制板上设置若干拉索,此外再制作一块封板;安装加固,将预制板配合嵌入企口,使预制板能够封堵预留孔洞的前端,将封板盖在预留孔洞的后端,将预制板上的拉索穿过封板并连接背楞,使背楞抵靠在封板上,封板与预留孔洞的后端之间设置有浇注口;浇注,从浇注口中浇注混凝土,使混凝土将预留孔洞填充;拆除,混凝土终凝后拆除封板,凿除浇注口位置多余的混凝土,并进行修补打磨,洒水养护十四天。
Plugging process for reserved hole in concrete outer wall of building
一种用于建筑物混凝土外墙预留孔洞的封堵工艺
YUE LUN (author) / DUAN FENGZHU (author) / YI XUECONG (author) / CHEN ZHONGWEN (author)
2022-06-28
Patent
Electronic Resource
Chinese
Concrete outer wall reserved hole plugging device and assembly
European Patent Office | 2024
|Structural outer wall reserved hole plugging construction method
European Patent Office | 2021
|Construction method for plugging reserved hole of outer wall finished product
European Patent Office | 2024
|Method for plugging reserved hole in outer wall of attached lifting scaffold
European Patent Office | 2024
|