A platform for research: civil engineering, architecture and urbanism
Road construction method for outdoor high backfill area of community
The invention discloses a road construction method for an outdoor high-backfill area of a community, and belongs to the technical field of road construction. According to the invention, the building waste mixture is compacted in a layered manner, so that the settlement phenomenon is avoided, and the residual value of the building waste can be reutilized; the thickness of concrete of a road structure layer is properly controlled, and a reinforcing mesh is added, so that the integrity of the road structure layer is guaranteed, materials can be saved to the greatest extent, high backfill soil is changed into plain soil backfill with the thickness not exceeding 1000 mm, the compaction degree is controlled, and under the combined action of layered compaction of building waste and the reinforcing mesh added in the concrete structure layer, the construction quality is improved. The possibility of road settlement of the high-backfill area community is completely eradicated, materials are saved, and the community road engineering quality can be ensured, so that the high-quality target that maintenance is not needed for a long time after completion is achieved, and good safety production atmosphere and social reputation are obtained.
本发明公开了一种小区室外高回填区域道路施工方法,属于道路施工技术领域。本发明利用建筑废料混合物分层压实,既杜绝了沉降现象,又能二次利用建筑废料的残值;适当控制道路结构层混凝土厚度,并增加钢筋网片,既解决道路结构层的整体性,又能最大限度的节约材料,改变高回填土为素土回填不超过1000㎜厚,控制压实度,加上建筑废料分层压实和混凝土结构层内增加钢筋网片的共同作用下,彻底杜绝高回填区域小区道路沉降的可能性,既节约材料,又能确保小区道路工程质量,从而实现竣工后长期无须维修的高质量目标,取得了良好的安全生产氛围和社会信誉。
Road construction method for outdoor high backfill area of community
The invention discloses a road construction method for an outdoor high-backfill area of a community, and belongs to the technical field of road construction. According to the invention, the building waste mixture is compacted in a layered manner, so that the settlement phenomenon is avoided, and the residual value of the building waste can be reutilized; the thickness of concrete of a road structure layer is properly controlled, and a reinforcing mesh is added, so that the integrity of the road structure layer is guaranteed, materials can be saved to the greatest extent, high backfill soil is changed into plain soil backfill with the thickness not exceeding 1000 mm, the compaction degree is controlled, and under the combined action of layered compaction of building waste and the reinforcing mesh added in the concrete structure layer, the construction quality is improved. The possibility of road settlement of the high-backfill area community is completely eradicated, materials are saved, and the community road engineering quality can be ensured, so that the high-quality target that maintenance is not needed for a long time after completion is achieved, and good safety production atmosphere and social reputation are obtained.
本发明公开了一种小区室外高回填区域道路施工方法,属于道路施工技术领域。本发明利用建筑废料混合物分层压实,既杜绝了沉降现象,又能二次利用建筑废料的残值;适当控制道路结构层混凝土厚度,并增加钢筋网片,既解决道路结构层的整体性,又能最大限度的节约材料,改变高回填土为素土回填不超过1000㎜厚,控制压实度,加上建筑废料分层压实和混凝土结构层内增加钢筋网片的共同作用下,彻底杜绝高回填区域小区道路沉降的可能性,既节约材料,又能确保小区道路工程质量,从而实现竣工后长期无须维修的高质量目标,取得了良好的安全生产氛围和社会信誉。
Road construction method for outdoor high backfill area of community
一种小区室外高回填区域道路施工方法
YAO YUGUANG (author) / LI YANCHUN (author) / ZHANG XUNLAI (author)
2022-07-01
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Construction method of pipeline inspection well on high backfill area community road
European Patent Office | 2022
|European Patent Office | 2022
|High-backfill outdoor anti-precipitation rainfall sewage pipeline and construction method
European Patent Office | 2024
|European Patent Office | 2022
|Backfill construction method suitable for backfill engineering of clean area and complex space
European Patent Office | 2024
|