Construction method of pipeline inspection well on high backfill area community road
The invention discloses a construction method of a pipeline inspection well on a high backfill area community road, and belongs to the technical field of inspection well construction. According to the method, the influence of settlement of a high backfill area on a pipeline inspection well on a community road is changed, and 2: 8 lime soil is tamped on the periphery of the inspection well in a layered mode; the groove type reinforced concrete well seat is added to cover a backfill area on the periphery of the inspection well and is effectively connected with a community road structure layer to form a whole, so that the phenomena of sedimentation, pavement cracking, inspection well damage and the like of the pipeline inspection well in the later use process caused by deformation of the joint of the pipeline inspection well and the community road due to sedimentation are avoided; therefore, the construction quality of the community road engineering is ensured, the influence of the later use safety of the community road is eliminated, the later maintenance cost is saved, the high-quality goal that the long-term maintenance is not needed after completion can be realized, and good safety production atmosphere and social reputation are obtained.
本发明公开了一种高回填区域小区道路上管道检查井施工方法,属于检查井施工技术领域。本发明利用改变高回填区域的沉降对小区道路上管道检查井的影响,在检查井周边分层夯实灰土2:8灰土;增加凹槽式钢筋混凝土井座,使之覆盖检查井周边回填区域,与小区道路结构层有效连接,成为一个整体,解决因沉降引起的管道检查井与小区道路衔接处变形造成后期管道检查井在使用过程中发生沉降、路面开裂、检查井损坏等现象,进而保证小区道路工程的施工质量,消除小区道路在后期使用安全的影响,既节约后期维修成本,又能实现竣工后长期无须维修的高质量目标,取得了良好的安全生产氛围和社会信誉。
Construction method of pipeline inspection well on high backfill area community road
The invention discloses a construction method of a pipeline inspection well on a high backfill area community road, and belongs to the technical field of inspection well construction. According to the method, the influence of settlement of a high backfill area on a pipeline inspection well on a community road is changed, and 2: 8 lime soil is tamped on the periphery of the inspection well in a layered mode; the groove type reinforced concrete well seat is added to cover a backfill area on the periphery of the inspection well and is effectively connected with a community road structure layer to form a whole, so that the phenomena of sedimentation, pavement cracking, inspection well damage and the like of the pipeline inspection well in the later use process caused by deformation of the joint of the pipeline inspection well and the community road due to sedimentation are avoided; therefore, the construction quality of the community road engineering is ensured, the influence of the later use safety of the community road is eliminated, the later maintenance cost is saved, the high-quality goal that the long-term maintenance is not needed after completion can be realized, and good safety production atmosphere and social reputation are obtained.
本发明公开了一种高回填区域小区道路上管道检查井施工方法,属于检查井施工技术领域。本发明利用改变高回填区域的沉降对小区道路上管道检查井的影响,在检查井周边分层夯实灰土2:8灰土;增加凹槽式钢筋混凝土井座,使之覆盖检查井周边回填区域,与小区道路结构层有效连接,成为一个整体,解决因沉降引起的管道检查井与小区道路衔接处变形造成后期管道检查井在使用过程中发生沉降、路面开裂、检查井损坏等现象,进而保证小区道路工程的施工质量,消除小区道路在后期使用安全的影响,既节约后期维修成本,又能实现竣工后长期无须维修的高质量目标,取得了良好的安全生产氛围和社会信誉。
Construction method of pipeline inspection well on high backfill area community road
一种高回填区域小区道路上管道检查井施工方法
YAO YUGUANG (author) / LI YANCHUN (author) / ZHANG XUNLAI (author)
2022-07-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Road construction method for outdoor high backfill area of community
European Patent Office | 2022
|European Patent Office | 2022
|Vibroflotation compaction method for pipeline backfill construction
European Patent Office | 2021
|Underground pipeline backfill supporting protection construction method
European Patent Office | 2021
|