A platform for research: civil engineering, architecture and urbanism
Cable length adjustment amount solving method for adjusting displacement of cable-stayed bridge
The invention discloses a cable length adjustment amount solving method for adjusting displacement of a cable-stayed bridge. The cable length adjustment amount solving method comprises the following steps that a cable length-anchor point displacement influence matrix is solved; determining a target vector of displacement adjustment; determining an anchor point displacement participation coefficient; and iteratively solving the cable length adjustment value. The method for stably, conveniently and rapidly solving a group of uniform and reasonable cable length adjustment amount is provided, the cable length correction amount obtained through solving is uniform and reasonable, the calculation result is superior to that of an existing conventional least square method, the iteration method is obviously superior to an existing calculation method in calculation, the design time is greatly shortened, and the design efficiency is improved. And the working efficiency is improved. The method can be used for quickly and accurately adjusting the configuration of the cable-stayed bridge, including tower deflection and girder line shape.
本发明公开了一种用于调整斜拉桥位移的索长调整量求解方法,包括以下步骤:求解索长‑锚点位移的影响矩阵;确定位移调整的目标向量;确定锚点位移参与系数;迭代求解索长调整值。本发明提供了一种稳定、方便、快速的求解出一组均匀合理的索长调整量的方法,本发明求解得到的索长修正量均匀、合理,计算结果优于目前常规的最小二乘法,本发明的迭代法计算明显优于现有的计算方法,大幅缩短了设计耗时,提高了工作效率。本发明能够快速准确的用于调整斜拉桥的构型,包括塔偏和主梁线形。
Cable length adjustment amount solving method for adjusting displacement of cable-stayed bridge
The invention discloses a cable length adjustment amount solving method for adjusting displacement of a cable-stayed bridge. The cable length adjustment amount solving method comprises the following steps that a cable length-anchor point displacement influence matrix is solved; determining a target vector of displacement adjustment; determining an anchor point displacement participation coefficient; and iteratively solving the cable length adjustment value. The method for stably, conveniently and rapidly solving a group of uniform and reasonable cable length adjustment amount is provided, the cable length correction amount obtained through solving is uniform and reasonable, the calculation result is superior to that of an existing conventional least square method, the iteration method is obviously superior to an existing calculation method in calculation, the design time is greatly shortened, and the design efficiency is improved. And the working efficiency is improved. The method can be used for quickly and accurately adjusting the configuration of the cable-stayed bridge, including tower deflection and girder line shape.
本发明公开了一种用于调整斜拉桥位移的索长调整量求解方法,包括以下步骤:求解索长‑锚点位移的影响矩阵;确定位移调整的目标向量;确定锚点位移参与系数;迭代求解索长调整值。本发明提供了一种稳定、方便、快速的求解出一组均匀合理的索长调整量的方法,本发明求解得到的索长修正量均匀、合理,计算结果优于目前常规的最小二乘法,本发明的迭代法计算明显优于现有的计算方法,大幅缩短了设计耗时,提高了工作效率。本发明能够快速准确的用于调整斜拉桥的构型,包括塔偏和主梁线形。
Cable length adjustment amount solving method for adjusting displacement of cable-stayed bridge
一种用于调整斜拉桥位移的索长调整量求解方法
SU WEI (author) / MENG FANZENG (author) / ZHUO YI (author) / LI YAN (author) / SONG SHUFENG (author) / DI HAO (author) / WEI JIANFENG (author) / WANG SHENGJIE (author) / GAO FENG (author) / YANG LEI (author)
2022-07-01
Patent
Electronic Resource
Chinese
Cable-stayed bridge inhaul cable adjusting structure and adjusting method thereof
European Patent Office | 2024
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
European Patent Office | 2020
|Linear adjustment method of cable-stayed suspension cable cooperative system bridge
European Patent Office | 2023
|