Construction method for reserved hole of foundation bolt of dust removal fan
A construction method for a reserved hole of a foundation bolt of a dust removal fan is characterized by comprising the following steps that a, a reinforcement cage frame with the same size as the reserved hole is manufactured according to the design and the size of the reserved hole of the foundation bolt, b, a plurality of vertical rods are arranged on the side faces of the periphery of the cuboid reinforcement cage frame at uniform intervals, c, a plurality of cross rods are arranged on the side faces of the periphery of the cuboid reinforcement cage frame at uniform intervals, d, a plurality of bottom rods are arranged on the end face of the bottom of the cuboid reinforcement cage at intervals of 50 mm, e, the cuboid reinforcement cage frame is completely wrapped with a steel wire mesh, and f, after foundation concrete construction is completed, the steel wire mesh at the top of the reinforcement cage is broken. The construction method for the reserved hole of the foundation bolt of the dust removal fan has the advantages that the reinforcement cage frame is simple in structure and convenient to manufacture, the mounting precision and the forming effect of the reserved hole of the dust removal fan are improved, the operation efficiency is high, labor is saved, the situation of repeated reworking treatment is avoided, the engineering quality is guaranteed, and the engineering cost is reduced.
一种除尘风机地脚螺栓预留孔洞的施工方法,其特征在于包括以下步骤:a、根据设计按照地脚螺栓预留孔洞的尺寸制作一个与预留洞口尺寸相同的钢筋笼框架,b、长方体钢筋笼框架的四周侧面以均匀间距设置若干竖杆,c、长方体钢筋笼框架的四周侧面以均匀间距设置若干横杆,d、长方体钢筋笼底部端面以每隔50mm间距设置若干底杆,e、长方体钢筋笼框架全部包裹钢丝网,f、基础混凝土施工完成后,将钢筋笼顶部钢丝网破除。本发明的除尘风机地脚螺栓预留孔洞的施工方法具有钢筋笼框架结构简单、制作方便,提升除尘风机预留孔洞安装精度及成型效果,作业效率高,节约人工、避免重复返工处理的情况出现,保证工程质量和降低工程成本的优点。
Construction method for reserved hole of foundation bolt of dust removal fan
A construction method for a reserved hole of a foundation bolt of a dust removal fan is characterized by comprising the following steps that a, a reinforcement cage frame with the same size as the reserved hole is manufactured according to the design and the size of the reserved hole of the foundation bolt, b, a plurality of vertical rods are arranged on the side faces of the periphery of the cuboid reinforcement cage frame at uniform intervals, c, a plurality of cross rods are arranged on the side faces of the periphery of the cuboid reinforcement cage frame at uniform intervals, d, a plurality of bottom rods are arranged on the end face of the bottom of the cuboid reinforcement cage at intervals of 50 mm, e, the cuboid reinforcement cage frame is completely wrapped with a steel wire mesh, and f, after foundation concrete construction is completed, the steel wire mesh at the top of the reinforcement cage is broken. The construction method for the reserved hole of the foundation bolt of the dust removal fan has the advantages that the reinforcement cage frame is simple in structure and convenient to manufacture, the mounting precision and the forming effect of the reserved hole of the dust removal fan are improved, the operation efficiency is high, labor is saved, the situation of repeated reworking treatment is avoided, the engineering quality is guaranteed, and the engineering cost is reduced.
一种除尘风机地脚螺栓预留孔洞的施工方法,其特征在于包括以下步骤:a、根据设计按照地脚螺栓预留孔洞的尺寸制作一个与预留洞口尺寸相同的钢筋笼框架,b、长方体钢筋笼框架的四周侧面以均匀间距设置若干竖杆,c、长方体钢筋笼框架的四周侧面以均匀间距设置若干横杆,d、长方体钢筋笼底部端面以每隔50mm间距设置若干底杆,e、长方体钢筋笼框架全部包裹钢丝网,f、基础混凝土施工完成后,将钢筋笼顶部钢丝网破除。本发明的除尘风机地脚螺栓预留孔洞的施工方法具有钢筋笼框架结构简单、制作方便,提升除尘风机预留孔洞安装精度及成型效果,作业效率高,节约人工、避免重复返工处理的情况出现,保证工程质量和降低工程成本的优点。
Construction method for reserved hole of foundation bolt of dust removal fan
一种除尘风机地脚螺栓预留孔洞的施工方法
LI KAIGE (author) / HUANG XIAOFENG (author) / LIU LINHAI (author)
2022-07-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for reserved hole of equipment foundation bolt
European Patent Office | 2015
|Construction device and construction method for reserved bolt hole of equipment foundation
European Patent Office | 2024
|Mass concrete equipment foundation reserved bolt hole template
European Patent Office | 2024
|CONSTRUCTION METHOD FOR RADIATION-PROOF CONCRETE HOLE RESERVED SPLIT BOLT
European Patent Office | 2023
|Reserved bolt hole accurate positioning die and positioning method thereof
European Patent Office | 2022
|