High fill roadbed filling construction method
The invention relates to the technical field of roadbed filling, and discloses a high-fill roadbed filling construction method which comprises the steps of overall planning work, settlement stability observation, cleaning preparation, construction preparation, reinforcing layer laying, supporting layer laying, reinforcing layer laying, supporting layer laying, reinforcing layer laying, filling work and construction safety. According to the high-fill roadbed filling construction method, the overall construction effect is improved by conducting unified allocation and professional unified command on material transportation before construction, meanwhile, constructors are strictly selected before construction, qualified workers with certificates are selected for construction, the construction professionality is improved, and the construction efficiency is improved. The construction site is observed and recorded in detail during construction, so that the effect of improving the construction quality is achieved according to detailed data in cooperation with later construction, and meanwhile, safety accidents caused by fatigue during construction are reduced through supervision and shift change of constructors during use.
本发明涉及路基填筑技术领域,且公开了一种高填方路基填筑施工方法,包括统筹工作、沉降稳定观测、清理准备、施工准备、铺设加强层、铺设支撑层、铺设加强层、铺设支撑层、铺设加固层、填筑工作和施工安全。该高填方路基填筑施工方法,通过在施工前的进行统一的调配、运料进行专业统一的指挥来提高施工的整体效果,同时在施工前对施工人员进行严格的选用,选用合格持证上岗的工作人员进行施工,提高施工使得专业性,在施工和施工时对施工地点进行详细的观测和记录,以便根据详细的数据配合后期的施工,达到提高施工质量的效果,同时在使用时对施工人员的监管和交班制度,有助于减少施工时因疲劳发生的安全事故。
High fill roadbed filling construction method
The invention relates to the technical field of roadbed filling, and discloses a high-fill roadbed filling construction method which comprises the steps of overall planning work, settlement stability observation, cleaning preparation, construction preparation, reinforcing layer laying, supporting layer laying, reinforcing layer laying, supporting layer laying, reinforcing layer laying, filling work and construction safety. According to the high-fill roadbed filling construction method, the overall construction effect is improved by conducting unified allocation and professional unified command on material transportation before construction, meanwhile, constructors are strictly selected before construction, qualified workers with certificates are selected for construction, the construction professionality is improved, and the construction efficiency is improved. The construction site is observed and recorded in detail during construction, so that the effect of improving the construction quality is achieved according to detailed data in cooperation with later construction, and meanwhile, safety accidents caused by fatigue during construction are reduced through supervision and shift change of constructors during use.
本发明涉及路基填筑技术领域,且公开了一种高填方路基填筑施工方法,包括统筹工作、沉降稳定观测、清理准备、施工准备、铺设加强层、铺设支撑层、铺设加强层、铺设支撑层、铺设加固层、填筑工作和施工安全。该高填方路基填筑施工方法,通过在施工前的进行统一的调配、运料进行专业统一的指挥来提高施工的整体效果,同时在施工前对施工人员进行严格的选用,选用合格持证上岗的工作人员进行施工,提高施工使得专业性,在施工和施工时对施工地点进行详细的观测和记录,以便根据详细的数据配合后期的施工,达到提高施工质量的效果,同时在使用时对施工人员的监管和交班制度,有助于减少施工时因疲劳发生的安全事故。
High fill roadbed filling construction method
一种高填方路基填筑施工方法
LI YI (author) / MAO YUNHUA (author) / WU CHENGXIANG (author) / MA BO (author) / YANG QUNRONG (author)
2022-07-12
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Construction method for filling high-fill roadbed of mountain road