A platform for research: civil engineering, architecture and urbanism
Concrete wall column formwork and construction method
The invention relates to a concrete wall column formwork which comprises a formwork body, vertical ridges arranged on the outer side of the formwork body and a supporting plate, universal wheels are arranged at the bottom of the supporting plate in an array mode, an abutting plate is arranged at the top of the supporting plate, a crawling ladder is arranged at the top of the supporting plate, and a supporting rod is arranged between the abutting plate and the crawling ladder. A split bolt is arranged between the two oppositely-arranged abutting plates, and a steel pipe is arranged between the split bolt and the abutting plates. After a worker installs the formwork and the vertical edge, the worker tightly abuts against the abutting plate on the supporting plate and the vertical edge, then the worker installs the split bolt with the help of the crawling ladder, the working process that the worker builds a scaffold is omitted, the time for the worker to support the formwork is greatly shortened, and meanwhile the working efficiency is improved. The contact area of the abutting plates and the vertical edges is enlarged, when one vertical edge moves in the direction away from the formwork, the abutting plates hinder movement of the vertical edges under the action of the split bolts and the supporting plates, and the stability of formwork supporting is also improved.
本申请涉及一种混凝土墙柱模板,包括模板、设置在模板外侧的竖楞和支撑板,支撑板的底部阵列设置有万向轮,支撑板的顶部设置有抵接板,支撑板的顶部设置有爬梯,抵接板和爬梯之间设置有支撑杆,两个相对设置的抵接板之间设置有对拉螺栓,对拉螺栓和抵接板之间设置有钢管。工作人员将模板和竖楞安装完成后,工作人员将支撑板上的抵接板与竖楞抵紧,然后工作人员借助爬梯安装对拉螺栓,省去了工作人员搭建脚手架的工作过程,极大缩短了工作人员对模板进行支撑的时间,同时,抵接板扩大了与竖楞的接触面积,当其中一个竖楞向远离模板的方向移动时,抵接板在对拉螺栓和支撑板的作用下对竖楞的移动进行阻碍,也提高了对模板支撑的稳固性。
Concrete wall column formwork and construction method
The invention relates to a concrete wall column formwork which comprises a formwork body, vertical ridges arranged on the outer side of the formwork body and a supporting plate, universal wheels are arranged at the bottom of the supporting plate in an array mode, an abutting plate is arranged at the top of the supporting plate, a crawling ladder is arranged at the top of the supporting plate, and a supporting rod is arranged between the abutting plate and the crawling ladder. A split bolt is arranged between the two oppositely-arranged abutting plates, and a steel pipe is arranged between the split bolt and the abutting plates. After a worker installs the formwork and the vertical edge, the worker tightly abuts against the abutting plate on the supporting plate and the vertical edge, then the worker installs the split bolt with the help of the crawling ladder, the working process that the worker builds a scaffold is omitted, the time for the worker to support the formwork is greatly shortened, and meanwhile the working efficiency is improved. The contact area of the abutting plates and the vertical edges is enlarged, when one vertical edge moves in the direction away from the formwork, the abutting plates hinder movement of the vertical edges under the action of the split bolts and the supporting plates, and the stability of formwork supporting is also improved.
本申请涉及一种混凝土墙柱模板,包括模板、设置在模板外侧的竖楞和支撑板,支撑板的底部阵列设置有万向轮,支撑板的顶部设置有抵接板,支撑板的顶部设置有爬梯,抵接板和爬梯之间设置有支撑杆,两个相对设置的抵接板之间设置有对拉螺栓,对拉螺栓和抵接板之间设置有钢管。工作人员将模板和竖楞安装完成后,工作人员将支撑板上的抵接板与竖楞抵紧,然后工作人员借助爬梯安装对拉螺栓,省去了工作人员搭建脚手架的工作过程,极大缩短了工作人员对模板进行支撑的时间,同时,抵接板扩大了与竖楞的接触面积,当其中一个竖楞向远离模板的方向移动时,抵接板在对拉螺栓和支撑板的作用下对竖楞的移动进行阻碍,也提高了对模板支撑的稳固性。
Concrete wall column formwork and construction method
一种混凝土墙柱模板及施工方法
HUANG WENXIN (author)
2022-07-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete structure column wall formwork positioning device, formwork system and construction method
European Patent Office | 2024
|Concrete wall column formwork positioning device and construction method thereof
European Patent Office | 2021
|Wall body concrete pouring wall formwork construction method
European Patent Office | 2020
|