A platform for research: civil engineering, architecture and urbanism
The invention discloses an assembly type precast concrete pipe gallery for municipal building construction, which comprises an arranged bottom plate, supporting plates are symmetrically mounted at the top of the bottom plate, a top plate is connected to the tops of the supporting plates, an insertion rod is connected to the top of the top plate in a penetrating manner, and meanwhile, right-angle pieces and locking nuts are connected to the corners where the supporting plates and the top plate are connected; the bottom of the inserting rod is inserted into an inserting opening, and the inserting opening is formed in the top of the supporting plate. An extrusion rod is attached to the outer side of the insertion rod in an abutting mode and connected into a moving groove, the moving groove is formed in the inner side of the top plate, and a first storage bag is installed in the moving groove; and mounting feet are symmetrically mounted at the top of the bottom plate, the mounting feet are connected with the bottom of the supporting plate in a nested mode, and a second storage bag is arranged on the inner side of the bottom of the supporting plate. The fabricated precast concrete pipe gallery for municipal building construction can be conveniently positioned, spliced and assembled, and meanwhile, the joints can be subjected to sealing and waterproof treatment.
本发明公开了一种市政建筑施工用装配式预制混凝土管廊,包括设置的底板,且底板的顶部对称安装有支撑板,并且支撑板的顶部连接有顶板,而且顶板的顶部贯穿连接有插杆,同时支撑板和顶板连接的拐角处连接有直角件和锁紧螺母;还包括:所述插杆的底部插接于插口中,且插口开设于支撑板的顶部;插杆的外侧贴合抵接有挤压杆,且挤压杆连接于移动槽中,并且移动槽开设于顶板的内侧,而且移动槽中安装有第一储囊;所述底板的顶部对称安装有安装脚,且安装脚与支撑板的底部嵌套连接,并且支撑板的底部内侧设置有第二储囊。该市政建筑施工用装配式预制混凝土管廊,可以进行便捷的定位拼接和组装,同时能够对连接处进行密封防水处理。
The invention discloses an assembly type precast concrete pipe gallery for municipal building construction, which comprises an arranged bottom plate, supporting plates are symmetrically mounted at the top of the bottom plate, a top plate is connected to the tops of the supporting plates, an insertion rod is connected to the top of the top plate in a penetrating manner, and meanwhile, right-angle pieces and locking nuts are connected to the corners where the supporting plates and the top plate are connected; the bottom of the inserting rod is inserted into an inserting opening, and the inserting opening is formed in the top of the supporting plate. An extrusion rod is attached to the outer side of the insertion rod in an abutting mode and connected into a moving groove, the moving groove is formed in the inner side of the top plate, and a first storage bag is installed in the moving groove; and mounting feet are symmetrically mounted at the top of the bottom plate, the mounting feet are connected with the bottom of the supporting plate in a nested mode, and a second storage bag is arranged on the inner side of the bottom of the supporting plate. The fabricated precast concrete pipe gallery for municipal building construction can be conveniently positioned, spliced and assembled, and meanwhile, the joints can be subjected to sealing and waterproof treatment.
本发明公开了一种市政建筑施工用装配式预制混凝土管廊,包括设置的底板,且底板的顶部对称安装有支撑板,并且支撑板的顶部连接有顶板,而且顶板的顶部贯穿连接有插杆,同时支撑板和顶板连接的拐角处连接有直角件和锁紧螺母;还包括:所述插杆的底部插接于插口中,且插口开设于支撑板的顶部;插杆的外侧贴合抵接有挤压杆,且挤压杆连接于移动槽中,并且移动槽开设于顶板的内侧,而且移动槽中安装有第一储囊;所述底板的顶部对称安装有安装脚,且安装脚与支撑板的底部嵌套连接,并且支撑板的底部内侧设置有第二储囊。该市政建筑施工用装配式预制混凝土管廊,可以进行便捷的定位拼接和组装,同时能够对连接处进行密封防水处理。
Fabricated precast concrete pipe gallery for municipal building construction
一种市政建筑施工用装配式预制混凝土管廊
JIN YUXIN (author)
2022-07-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Fabricated precast concrete elevator well gallery and construction method thereof
European Patent Office | 2023
|Fabricated building concrete precast stair installation construction process
European Patent Office | 2020
|European Patent Office | 2015
|Municipal pipe gallery structure and construction method
European Patent Office | 2021
|