A platform for research: civil engineering, architecture and urbanism
High-precision building block and post-cast constructional column connecting piece and construction method thereof
The invention provides a high-precision building block and post-cast constructional column connecting piece and a construction method thereof.The high-precision building block and post-cast constructional column connecting piece comprises a T-shaped pulling piece, the T-shaped pulling piece comprises a transverse section and a vertical section, one end of the vertical section is perpendicularly fixed to the middle of the transverse section, the transverse section located on one side of the vertical section is of a straight structure, a through hole is formed in the straight structure, and the transverse section located on the other side of the vertical section is of a broken line structure; the side, located on the transverse section, of the vertical section is fixedly connected with a double-thread rod, and the double-thread rod is parallel to the transverse section. The problems that the requirement for high-precision mortar joints is controlled to be 3-5 mm, and the quality requirement cannot be met by using a traditional building block 2 phi 6 tie bar are solved. Belongs to the technical field of building structure engineering.
本发明提供一种高精砌块与后浇构造柱连接片及其施工方法,包括“T”型拉结片,“T”型拉结片包括横向段和一端垂直固定于横向段中部的垂向段,位于垂向段一侧的横向段为平直结构,该平直结构上开设有通孔,另一侧的横向段为折线结构,垂向段上位于横向段的一侧固定连接有双螺纹杆,且双螺纹杆均平行于横向段。以解决高精度灰缝要求控制在3~5mm,使用传统砌块2φ6拉结筋不能满足质量要求的问题。属于建筑结构工程技术领域。
High-precision building block and post-cast constructional column connecting piece and construction method thereof
The invention provides a high-precision building block and post-cast constructional column connecting piece and a construction method thereof.The high-precision building block and post-cast constructional column connecting piece comprises a T-shaped pulling piece, the T-shaped pulling piece comprises a transverse section and a vertical section, one end of the vertical section is perpendicularly fixed to the middle of the transverse section, the transverse section located on one side of the vertical section is of a straight structure, a through hole is formed in the straight structure, and the transverse section located on the other side of the vertical section is of a broken line structure; the side, located on the transverse section, of the vertical section is fixedly connected with a double-thread rod, and the double-thread rod is parallel to the transverse section. The problems that the requirement for high-precision mortar joints is controlled to be 3-5 mm, and the quality requirement cannot be met by using a traditional building block 2 phi 6 tie bar are solved. Belongs to the technical field of building structure engineering.
本发明提供一种高精砌块与后浇构造柱连接片及其施工方法,包括“T”型拉结片,“T”型拉结片包括横向段和一端垂直固定于横向段中部的垂向段,位于垂向段一侧的横向段为平直结构,该平直结构上开设有通孔,另一侧的横向段为折线结构,垂向段上位于横向段的一侧固定连接有双螺纹杆,且双螺纹杆均平行于横向段。以解决高精度灰缝要求控制在3~5mm,使用传统砌块2φ6拉结筋不能满足质量要求的问题。属于建筑结构工程技术领域。
High-precision building block and post-cast constructional column connecting piece and construction method thereof
一种高精砌块与后浇构造柱连接片及其施工方法
LIU YEXIN (author) / CHEN RUI (author) / DENG YUANYANG (author) / ZENG PENG (author) / HUANG ZHICONG (author) / DU GUANGWEI (author) / LI SIYUAN (author) / WEI ZHUOHONG (author)
2022-07-29
Patent
Electronic Resource
Chinese
Novel construction formwork and construction method for post-cast constructional column
European Patent Office | 2023
|European Patent Office | 2020
|Fabricated building constructional column and construction method thereof
European Patent Office | 2021
|Formwork connecting piece for post-cast strip construction
European Patent Office | 2024
|