Utility tunnel enclosure wall and construction method thereof
The invention relates to a comprehensive pipe gallery enclosure wall and a construction method thereof. According to the scheme, the construction method comprises the following steps that S1, a construction site is leveled; s2, groove wall reinforcement; s3, staking out in survey and digging a groove; s4, a guide hole is drilled through rotary drilling; s5, the embedded box is hoisted and placed; s6, a pile machine is in place; s7, installing an inclinometer; s8, forming a wall; s9, H-shaped steel is inserted; and S10, pulling out the H-shaped steel, grouting and backfilling. The construction method has the advantages that the construction safety is improved, the stability of the formed wall body is improved, the deformation amount of the foundation pit is reduced, the construction quality of the comprehensive pipe gallery enclosure wall is improved, the construction efficiency is improved, and the popularization value is high.
本发明涉及综合管廊围护墙及其施工方法,该方案包括以下步骤:S1、施工场地平整;S2、槽壁加固;S3、测量放样及开挖沟槽;S4、旋挖钻引孔;S5、吊放预埋箱;S6、桩机就位;S7、安装测斜仪;S8、成墙;S9、H型钢插入;S10、H型钢拔除及灌浆回填。本发明具有提高施工安全性,提高已成型墙体的稳定性,减少基坑变形量的优点,提高了综合管廊围护墙的施工质量,提高施工效率,有较高的推广价值。
Utility tunnel enclosure wall and construction method thereof
The invention relates to a comprehensive pipe gallery enclosure wall and a construction method thereof. According to the scheme, the construction method comprises the following steps that S1, a construction site is leveled; s2, groove wall reinforcement; s3, staking out in survey and digging a groove; s4, a guide hole is drilled through rotary drilling; s5, the embedded box is hoisted and placed; s6, a pile machine is in place; s7, installing an inclinometer; s8, forming a wall; s9, H-shaped steel is inserted; and S10, pulling out the H-shaped steel, grouting and backfilling. The construction method has the advantages that the construction safety is improved, the stability of the formed wall body is improved, the deformation amount of the foundation pit is reduced, the construction quality of the comprehensive pipe gallery enclosure wall is improved, the construction efficiency is improved, and the popularization value is high.
本发明涉及综合管廊围护墙及其施工方法,该方案包括以下步骤:S1、施工场地平整;S2、槽壁加固;S3、测量放样及开挖沟槽;S4、旋挖钻引孔;S5、吊放预埋箱;S6、桩机就位;S7、安装测斜仪;S8、成墙;S9、H型钢插入;S10、H型钢拔除及灌浆回填。本发明具有提高施工安全性,提高已成型墙体的稳定性,减少基坑变形量的优点,提高了综合管廊围护墙的施工质量,提高施工效率,有较高的推广价值。
Utility tunnel enclosure wall and construction method thereof
综合管廊围护墙及其施工方法
LI JIA (author) / YANG HUI (author) / CHEN JIANG (author) / ZHANG YUANPING (author) / YE JIANFA (author) / LI GUOQIANG (author) / LIN BIWU (author) / LIU MING (author) / LIU YANG (author) / TU ZHANGFENG (author)
2022-08-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Multifunctional enclosure wall body and construction method thereof
European Patent Office | 2024
|Wall enclosure moisture management system and construction method thereof
European Patent Office | 2023
|Construction enclosure device and enclosure method thereof
European Patent Office | 2023
|