A platform for research: civil engineering, architecture and urbanism
Fabricated concrete shear wall mounting and supporting device and construction method
The invention is applicable to the technical field of building construction, and provides a fabricated concrete shear wall mounting and supporting device and a construction method.The fabricated concrete shear wall mounting and supporting device comprises a base and further comprises a supporting structure and a mounting seat, and a control assembly is rotationally connected into the mounting seat and drives a rotating part to rotate; the rotating piece drives the second abutting base to move through the second connecting piece and the connecting assembly, the rotating piece drives the first abutting base to move through the first connecting piece and the connecting assembly, and the first abutting base and the second abutting base abut against the supporting structures on the two sides of the shear wall body in a mutual approaching mode. The screw rod drives the second moving seat to move through the first moving seat, so that the second moving seat is connected with the inserting seat in an inserting mode, the first moving seat drives the clamping claw to rotate in the mode of moving relative to the second moving seat, the clamping claw is connected with the inserting seat in a clamping mode in a rotating mode, and the locking structure achieves the effect of efficient installation in the mode of locking the first abutting seat and the second abutting seat. The installation steps are simple, the installation efficiency is high, and the shear wall body can be stably supported.
本发明适用于建筑施工技术领域,提供了一种装配式混凝土剪力墙安装支撑装置及施工方法,包括基底,还包括支撑结构和安装座,安装座内转动连接有控制组件,控制组件带动转动件转动,转动件通过连接件二和连接组件带动抵紧座二移动,转动件通过连接件一和连接组件带动抵紧座一移动,抵紧座一和抵紧座二通过相互靠近的方式抵紧剪力墙本体两侧的支撑结构;螺杆通过移动座一带动移动座二移动,使得移动座二与插接座插接,移动座一通过相对于移动座二移动的方式带动卡接爪转动,卡接爪通过转动的方式与插接座卡接,锁紧结构通过将抵紧座一和抵紧座二锁紧的方式实现高效安装的效果。本发明的安装步骤简单,安装效率高,能够稳定支撑剪力墙本体。
Fabricated concrete shear wall mounting and supporting device and construction method
The invention is applicable to the technical field of building construction, and provides a fabricated concrete shear wall mounting and supporting device and a construction method.The fabricated concrete shear wall mounting and supporting device comprises a base and further comprises a supporting structure and a mounting seat, and a control assembly is rotationally connected into the mounting seat and drives a rotating part to rotate; the rotating piece drives the second abutting base to move through the second connecting piece and the connecting assembly, the rotating piece drives the first abutting base to move through the first connecting piece and the connecting assembly, and the first abutting base and the second abutting base abut against the supporting structures on the two sides of the shear wall body in a mutual approaching mode. The screw rod drives the second moving seat to move through the first moving seat, so that the second moving seat is connected with the inserting seat in an inserting mode, the first moving seat drives the clamping claw to rotate in the mode of moving relative to the second moving seat, the clamping claw is connected with the inserting seat in a clamping mode in a rotating mode, and the locking structure achieves the effect of efficient installation in the mode of locking the first abutting seat and the second abutting seat. The installation steps are simple, the installation efficiency is high, and the shear wall body can be stably supported.
本发明适用于建筑施工技术领域,提供了一种装配式混凝土剪力墙安装支撑装置及施工方法,包括基底,还包括支撑结构和安装座,安装座内转动连接有控制组件,控制组件带动转动件转动,转动件通过连接件二和连接组件带动抵紧座二移动,转动件通过连接件一和连接组件带动抵紧座一移动,抵紧座一和抵紧座二通过相互靠近的方式抵紧剪力墙本体两侧的支撑结构;螺杆通过移动座一带动移动座二移动,使得移动座二与插接座插接,移动座一通过相对于移动座二移动的方式带动卡接爪转动,卡接爪通过转动的方式与插接座卡接,锁紧结构通过将抵紧座一和抵紧座二锁紧的方式实现高效安装的效果。本发明的安装步骤简单,安装效率高,能够稳定支撑剪力墙本体。
Fabricated concrete shear wall mounting and supporting device and construction method
一种装配式混凝土剪力墙安装支撑装置及施工方法
LI XIANGQUAN (author) / CHEN ZHUANGWEI (author) / GAO DA (author) / WU SHANGZHI (author) / LI MINGHAO (author) / ZHANG RUIXI (author) / CHEN HUILIN (author) / LUO FUSHENG (author)
2022-08-05
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2024
|