A platform for research: civil engineering, architecture and urbanism
Construction device and construction method of fabricated concrete structure prefabricated shear wall
The invention relates to the technical field of building construction, and discloses a construction device and a construction method of an assembly type concrete structure prefabricated shear wall, the construction device comprises a positioning support mechanism, an installation calibration mechanism, a side fixing mechanism, a shear assembly wall body and two guide rail rods, the middle portions of the adjacent sides of the movable seats are fixedly connected to one ends of the corresponding connecting rods correspondingly, and the other ends of the connecting rods are fixedly connected to the middle portions of the two ends of the mounting plate correspondingly. When mechanical grouting is carried out on the shear force assembly wall, the electric vibrator is matched with the conduction plate, grouting entering a wall sleeve is tamped, so that the compactness degree of concrete grouting in the sleeve is improved, meanwhile, bubbles in the concrete grouting can be discharged, the filling degree of the grouting in the sleeve is increased, and the construction efficiency is improved. The structure stress effect between the shear force assembly wall and the bottom layer structure plate is improved, and follow-up building construction is facilitated.
本发明涉及建筑施工技术领域,公开了一种装配式混凝土结构预制剪力墙的施工装置及其施工方法,包括定位支撑机构、安装校准机构、侧部固定机构、剪力装配墙体和两个导轨杆,两个所述导轨杆上均滑动连接有移动座,所述移动座相邻一侧的中部分别固定连接在对应连接杆的一端,所述连接杆的另一端分别固定连接在安装板的两端中部。通过对剪力装配墙体进行机械灌浆的同时,采用电动振动器与传导板的配合,将进入到墙体套筒内的灌浆进行夯实,从而提高套筒内混凝土灌浆密实程度,并且同时还可以将混凝土灌浆内的气泡进行排出,增加套筒内灌浆的充盈程度,提高了剪力装配墙体与底层结构板之间的结构受力效果,便于后续建筑施工的进行。
Construction device and construction method of fabricated concrete structure prefabricated shear wall
The invention relates to the technical field of building construction, and discloses a construction device and a construction method of an assembly type concrete structure prefabricated shear wall, the construction device comprises a positioning support mechanism, an installation calibration mechanism, a side fixing mechanism, a shear assembly wall body and two guide rail rods, the middle portions of the adjacent sides of the movable seats are fixedly connected to one ends of the corresponding connecting rods correspondingly, and the other ends of the connecting rods are fixedly connected to the middle portions of the two ends of the mounting plate correspondingly. When mechanical grouting is carried out on the shear force assembly wall, the electric vibrator is matched with the conduction plate, grouting entering a wall sleeve is tamped, so that the compactness degree of concrete grouting in the sleeve is improved, meanwhile, bubbles in the concrete grouting can be discharged, the filling degree of the grouting in the sleeve is increased, and the construction efficiency is improved. The structure stress effect between the shear force assembly wall and the bottom layer structure plate is improved, and follow-up building construction is facilitated.
本发明涉及建筑施工技术领域,公开了一种装配式混凝土结构预制剪力墙的施工装置及其施工方法,包括定位支撑机构、安装校准机构、侧部固定机构、剪力装配墙体和两个导轨杆,两个所述导轨杆上均滑动连接有移动座,所述移动座相邻一侧的中部分别固定连接在对应连接杆的一端,所述连接杆的另一端分别固定连接在安装板的两端中部。通过对剪力装配墙体进行机械灌浆的同时,采用电动振动器与传导板的配合,将进入到墙体套筒内的灌浆进行夯实,从而提高套筒内混凝土灌浆密实程度,并且同时还可以将混凝土灌浆内的气泡进行排出,增加套筒内灌浆的充盈程度,提高了剪力装配墙体与底层结构板之间的结构受力效果,便于后续建筑施工的进行。
Construction device and construction method of fabricated concrete structure prefabricated shear wall
一种装配式混凝土结构预制剪力墙的施工装置及施工方法
YU HONGFEI (author) / YANG BIN (author) / TAN RONGSHU (author) / ZHANG ZIHUI (author) / ZHANG WEILIANG (author)
2024-01-16
Patent
Electronic Resource
Chinese
Prefabricated wall, fabricated concrete wall and construction method thereof
European Patent Office | 2020
|Prefabricated concrete wall, fabricated building and construction method
European Patent Office | 2023
|Prefabricated concrete shear wall structure and construction method thereof
European Patent Office | 2022
|Shear wall prefabricated part and fabricated construction method thereof
European Patent Office | 2021
|Construction method of partially prefabricated concrete shear wall
European Patent Office | 2022
|