A platform for research: civil engineering, architecture and urbanism
Curtain wall construction device for high-rise building construction
The curtain wall construction device for high-rise building construction comprises a hanging basket and a crane, a plurality of cable grooves are formed in the outer wall of the hanging basket, first cables are in friction connection with the interiors of the cable grooves, a first collecting device is fixedly connected to the upper ends of the first cables, and a second cable is fixedly connected to the upper end of the first collecting device; a first supporting rod is arranged at the end, away from the first bundling device, of the second cable, first pulleys are fixedly connected to the two sides of the first supporting rod through fixing rods, a pull rod is fixedly connected to the middle of the first supporting rod, a second bundling device is fixedly connected to the end, away from the first supporting rod, of the pull rod, and a third cable is fixedly connected to the top end of the second bundling device. A middle shaft of the second pulley is fixedly connected to one end of a second supporting rod, the second supporting rod is rotationally installed on a push rod through a second fixing rod, the push rod is fixedly connected to the inner wall of the shell through a first fixing rod, and one end of the second supporting rod is fixedly connected with a sliding column.
本发明公开了一种高层建筑建造用幕墙施工装置,包括吊篮和起重机,吊篮的外壁上开设有若干缆绳槽,缆绳槽内部摩擦连接有缆绳一,缆绳一的上端固接有收束器一,收束器一的上端固接有缆绳二,缆绳二在远离收束器一的一端设有支撑杆一,支撑杆一的两侧通过固定杆固接有滑轮一,且支撑杆一的中间部分固接有拉杆,拉杆在远离支撑杆一的一端固接有收束器二,收束器二的顶端固接有缆绳三,起重机的一端固接有滑轮二,滑轮二通过绳槽滑动安装有缆绳三,滑轮二中部轴固接在支撑杆二的一端上,支撑杆二的通过固定杆二转动安装在推杆上,推杆通过固定杆一固接在外壳内壁上,支撑杆二的一端固接有滑动柱。
Curtain wall construction device for high-rise building construction
The curtain wall construction device for high-rise building construction comprises a hanging basket and a crane, a plurality of cable grooves are formed in the outer wall of the hanging basket, first cables are in friction connection with the interiors of the cable grooves, a first collecting device is fixedly connected to the upper ends of the first cables, and a second cable is fixedly connected to the upper end of the first collecting device; a first supporting rod is arranged at the end, away from the first bundling device, of the second cable, first pulleys are fixedly connected to the two sides of the first supporting rod through fixing rods, a pull rod is fixedly connected to the middle of the first supporting rod, a second bundling device is fixedly connected to the end, away from the first supporting rod, of the pull rod, and a third cable is fixedly connected to the top end of the second bundling device. A middle shaft of the second pulley is fixedly connected to one end of a second supporting rod, the second supporting rod is rotationally installed on a push rod through a second fixing rod, the push rod is fixedly connected to the inner wall of the shell through a first fixing rod, and one end of the second supporting rod is fixedly connected with a sliding column.
本发明公开了一种高层建筑建造用幕墙施工装置,包括吊篮和起重机,吊篮的外壁上开设有若干缆绳槽,缆绳槽内部摩擦连接有缆绳一,缆绳一的上端固接有收束器一,收束器一的上端固接有缆绳二,缆绳二在远离收束器一的一端设有支撑杆一,支撑杆一的两侧通过固定杆固接有滑轮一,且支撑杆一的中间部分固接有拉杆,拉杆在远离支撑杆一的一端固接有收束器二,收束器二的顶端固接有缆绳三,起重机的一端固接有滑轮二,滑轮二通过绳槽滑动安装有缆绳三,滑轮二中部轴固接在支撑杆二的一端上,支撑杆二的通过固定杆二转动安装在推杆上,推杆通过固定杆一固接在外壳内壁上,支撑杆二的一端固接有滑动柱。
Curtain wall construction device for high-rise building construction
一种高层建筑建造用幕墙施工装置
ZHAO JIAQUAN (author)
2022-08-05
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
High-rise building curtain wall glass installation construction method
European Patent Office | 2021
|Curtain wall construction device for building construction
European Patent Office | 2023
|High-rise building green curtain wall structure and construction method thereof
European Patent Office | 2024
|Building wall curtain wall construction device and construction method thereof
European Patent Office | 2023
|