A platform for research: civil engineering, architecture and urbanism
Prefabricated hollow interlayer concrete-filled steel tube arch bridge and construction method thereof
The invention relates to the field of fabricated arch bridge construction, in particular to a prefabricated concrete-filled steel tube arch bridge with a hollow interlayer and a construction method of the prefabricated concrete-filled steel tube arch bridge. The bridge deck slab, the hollow interlayer concrete filled steel tube on-arch stand column sections and the hollow interlayer concrete filled steel tube arch rib sections are prefabricated, concrete is poured into the hollow interlayer concrete filled steel tube on-arch stand column sections and the hollow interlayer concrete filled steel tube arch rib sections in the prefabrication stage, and the left side span hollow interlayer concrete filled steel tube arch rib sections and the right side span hollow interlayer concrete filled steel tube arch rib sections are temporarily hinged to arch feet after being spliced on site. By means of the characteristic that concrete is poured in the hollow interlayer steel pipe prefabricating stage, a truck crane is used for conducting construction on stand columns on a left side span arch and a right side span arch, and a hoisting system is erected on the two stand columns. By means of the hoisting system, the hollow interlayer steel pipe concrete arch bridge is constructed in a prefabricated mode from the side span to the midspan. The advantages of the fabricated hollow interlayer concrete filled steel tube arch rib section are utilized, the construction step of pouring concrete into the tube on site is eliminated, and the safety risk problem of pouring concrete into the tube is solved. Prefabricated construction can be achieved, the construction period is greatly shortened, the dead weight of a large-span bridge is reduced, the construction cost is reduced, and the advantages of rapidness, high reliability and the like are achieved.
本发明涉及装配式拱桥施工领域,具体地指一种预制装配化中空夹层钢管混凝土拱桥及其施工方法。预制桥面板、中空夹层钢管混凝土拱上立柱节段、中空夹层钢管混凝土拱肋节段,预制阶段在中空夹层钢管拱上立柱节段和中空夹层钢管拱肋节段内灌注混凝土,将左右边跨中空夹层钢管混凝土拱肋节段现场复拼后与拱脚临时铰接。借助中空夹层钢管预制阶段已灌入混凝土的特点,使用汽车吊对左右边跨拱上立柱施工,并在两个立柱上架设吊装系统。依靠吊装系统,中空夹层钢管混凝拱桥由边跨向跨中装配化施工。本发明专利利用装配式中空夹层钢管混凝土拱肋节段优势,剔除了现场往管内浇灌混凝土施工步骤,解决管内灌注混凝土安全风险问题。使用本发明能实现预制装配化施工,大大缩短施工周期,减轻大跨度桥梁自重,减少施工成本,具有快速化、可靠性高等优点。
Prefabricated hollow interlayer concrete-filled steel tube arch bridge and construction method thereof
The invention relates to the field of fabricated arch bridge construction, in particular to a prefabricated concrete-filled steel tube arch bridge with a hollow interlayer and a construction method of the prefabricated concrete-filled steel tube arch bridge. The bridge deck slab, the hollow interlayer concrete filled steel tube on-arch stand column sections and the hollow interlayer concrete filled steel tube arch rib sections are prefabricated, concrete is poured into the hollow interlayer concrete filled steel tube on-arch stand column sections and the hollow interlayer concrete filled steel tube arch rib sections in the prefabrication stage, and the left side span hollow interlayer concrete filled steel tube arch rib sections and the right side span hollow interlayer concrete filled steel tube arch rib sections are temporarily hinged to arch feet after being spliced on site. By means of the characteristic that concrete is poured in the hollow interlayer steel pipe prefabricating stage, a truck crane is used for conducting construction on stand columns on a left side span arch and a right side span arch, and a hoisting system is erected on the two stand columns. By means of the hoisting system, the hollow interlayer steel pipe concrete arch bridge is constructed in a prefabricated mode from the side span to the midspan. The advantages of the fabricated hollow interlayer concrete filled steel tube arch rib section are utilized, the construction step of pouring concrete into the tube on site is eliminated, and the safety risk problem of pouring concrete into the tube is solved. Prefabricated construction can be achieved, the construction period is greatly shortened, the dead weight of a large-span bridge is reduced, the construction cost is reduced, and the advantages of rapidness, high reliability and the like are achieved.
本发明涉及装配式拱桥施工领域,具体地指一种预制装配化中空夹层钢管混凝土拱桥及其施工方法。预制桥面板、中空夹层钢管混凝土拱上立柱节段、中空夹层钢管混凝土拱肋节段,预制阶段在中空夹层钢管拱上立柱节段和中空夹层钢管拱肋节段内灌注混凝土,将左右边跨中空夹层钢管混凝土拱肋节段现场复拼后与拱脚临时铰接。借助中空夹层钢管预制阶段已灌入混凝土的特点,使用汽车吊对左右边跨拱上立柱施工,并在两个立柱上架设吊装系统。依靠吊装系统,中空夹层钢管混凝拱桥由边跨向跨中装配化施工。本发明专利利用装配式中空夹层钢管混凝土拱肋节段优势,剔除了现场往管内浇灌混凝土施工步骤,解决管内灌注混凝土安全风险问题。使用本发明能实现预制装配化施工,大大缩短施工周期,减轻大跨度桥梁自重,减少施工成本,具有快速化、可靠性高等优点。
Prefabricated hollow interlayer concrete-filled steel tube arch bridge and construction method thereof
预制装配化中空夹层钢管混凝土拱桥及其施工方法
XU HONGSHENG (author) / HE RENKE (author) / YAN DONGHUANG (author) / YUE YACHAO (author)
2022-08-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Prefabricated hollow concrete-filled steel tube arch bridge and construction method thereof
European Patent Office | 2021
|Concrete-filled steel tube arch bridge and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Construction method of prefabricated cross beam of large-span concrete-filled steel tube arch bridge
European Patent Office | 2024
|