A platform for research: civil engineering, architecture and urbanism
Concrete pouring gate template
The invention discloses a concrete pouring gate formwork which comprises a front formwork body used for being installed on the front face of a reserved hole and a rear formwork body used for being installed on the back face of the reserved hole, the front formwork body comprises an obliquely-arranged pouring gate, installation plates are arranged on the two sides of the pouring gate, and two installation grooves are formed in the connecting positions of the pouring gate and the installation plates in a mirror image mode. The movable isolation plate is longitudinally inserted into the mounting groove. The construction method has the beneficial effects that the front formwork and the rear formwork are arranged to block the front side and the rear side of the reserved hole, after pouring is completed through the pouring opening, the movable isolation plate is longitudinally inserted into the mounting groove of the front formwork, redundant concrete at the position of the pouring opening is isolated from wall body concrete, and after the concrete reaches the formwork removal condition, when formwork removal is conducted, the movable isolation plate is inserted into the mounting groove of the front formwork; and the redundant concrete blocks are simultaneously removed along with the front template and the movable isolation plate, so that the trouble of manually chiseling away the redundant concrete blocks after the template is removed is avoided, the labor cost is saved, and the construction period is shortened.
本发明公开一种混凝土浇筑口模板,包括用于安装在预留洞口正面的前模板,以及用于安装在预留洞口的背面的后模板,前模板包括倾斜设置的浇筑口,浇筑口的两侧设置有安装板,浇筑口和安装板的连接处镜像设置有两个安装槽,活动隔离板纵向插入安装槽。本发明的有益效果是:通过设置前模板和后模板封堵预留洞口的前后两侧,当通过浇筑口浇筑完毕后,将活动隔离板纵向插入前模板的安装槽,使浇筑口位置的多余混凝土与墙身混凝土隔离开来,待混凝土达到拆模条件后,拆模时,多余的混凝土块就随前模板和活动隔离板同时拆除下来,免除了拆模后人工凿除多余混凝土块的麻烦,节省了人工费用,加快了工期。
Concrete pouring gate template
The invention discloses a concrete pouring gate formwork which comprises a front formwork body used for being installed on the front face of a reserved hole and a rear formwork body used for being installed on the back face of the reserved hole, the front formwork body comprises an obliquely-arranged pouring gate, installation plates are arranged on the two sides of the pouring gate, and two installation grooves are formed in the connecting positions of the pouring gate and the installation plates in a mirror image mode. The movable isolation plate is longitudinally inserted into the mounting groove. The construction method has the beneficial effects that the front formwork and the rear formwork are arranged to block the front side and the rear side of the reserved hole, after pouring is completed through the pouring opening, the movable isolation plate is longitudinally inserted into the mounting groove of the front formwork, redundant concrete at the position of the pouring opening is isolated from wall body concrete, and after the concrete reaches the formwork removal condition, when formwork removal is conducted, the movable isolation plate is inserted into the mounting groove of the front formwork; and the redundant concrete blocks are simultaneously removed along with the front template and the movable isolation plate, so that the trouble of manually chiseling away the redundant concrete blocks after the template is removed is avoided, the labor cost is saved, and the construction period is shortened.
本发明公开一种混凝土浇筑口模板,包括用于安装在预留洞口正面的前模板,以及用于安装在预留洞口的背面的后模板,前模板包括倾斜设置的浇筑口,浇筑口的两侧设置有安装板,浇筑口和安装板的连接处镜像设置有两个安装槽,活动隔离板纵向插入安装槽。本发明的有益效果是:通过设置前模板和后模板封堵预留洞口的前后两侧,当通过浇筑口浇筑完毕后,将活动隔离板纵向插入前模板的安装槽,使浇筑口位置的多余混凝土与墙身混凝土隔离开来,待混凝土达到拆模条件后,拆模时,多余的混凝土块就随前模板和活动隔离板同时拆除下来,免除了拆模后人工凿除多余混凝土块的麻烦,节省了人工费用,加快了工期。
Concrete pouring gate template
一种混凝土浇筑口模板
LIANG JUN (author) / ZHANG CHENGDUO (author) / HONG DONGMING (author) / ZHOU YIBIN (author) / CHEN YIQIAO (author) / LIAO ZHIZUAN (author) / GUO ZHENDONG (author) / HUANG JIAXIN (author) / LI HUIJIAO (author) / LAO CHENMING (author)
2022-08-12
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Gate grid device for stair concrete pouring and method for stair concrete pouring
European Patent Office | 2020
|Novel template for concrete pouring in constructional engineering
European Patent Office | 2023
|Enhanced hollow plastic composite template for pouring concrete
European Patent Office | 2022
|