A platform for research: civil engineering, architecture and urbanism
Hanging basket method construction method for suspended pouring box girder
The invention discloses a suspended pouring box girder hanging basket method construction method. The method comprises the following steps that S1, a box girder section at the upper end of a pier is poured; S2, a hanging basket is installed; S3, a next box girder section is poured; in the step S4, a vacuum-assisted grouting process is adopted to conduct grouting on the prestressed pipeline, and the vacuum-assisted grouting process comprises the steps that firstly, a vacuum pump is adopted to suck air in the prestressed pipeline at a grout outlet of the prestressed pipeline, so that the vacuum degree in the prestressed pipeline reaches-0.06 MPa to 0.1 MPa; and then pressing the cement paste into the pipeline at a mud jacking opening of the prestressed pipeline by using a mud jacking pump under the positive pressure of 0.5-0.7 MPa. The prestressed pipeline grouting device has the effect of improving the prestressed pipeline grouting quality.
本申请公开了一种悬浇箱梁挂篮法施工方法,其包括如下步骤:S1、浇筑桥墩上端处的箱梁节段,S2、安装挂篮,S3、浇筑下一节箱梁节段,S4、挂篮前移以及管道压浆,S5、浇筑后续箱梁节段,S6、浇筑合拢段;在步骤S4中,采用真空辅助压浆工艺对预应力管道压浆,真空辅助压浆工艺为:先在预应力管道的出浆口采用真空泵抽吸预应力管道中的空气,使预应力管道内达到‑0.06‑0.1MPa的真空度,然后在预应力管道的压浆口用压浆泵以0.5‑0.7MPa的正压力将水泥浆压入管道内。本申请具有提高预应力管道压浆的质量的效果。
Hanging basket method construction method for suspended pouring box girder
The invention discloses a suspended pouring box girder hanging basket method construction method. The method comprises the following steps that S1, a box girder section at the upper end of a pier is poured; S2, a hanging basket is installed; S3, a next box girder section is poured; in the step S4, a vacuum-assisted grouting process is adopted to conduct grouting on the prestressed pipeline, and the vacuum-assisted grouting process comprises the steps that firstly, a vacuum pump is adopted to suck air in the prestressed pipeline at a grout outlet of the prestressed pipeline, so that the vacuum degree in the prestressed pipeline reaches-0.06 MPa to 0.1 MPa; and then pressing the cement paste into the pipeline at a mud jacking opening of the prestressed pipeline by using a mud jacking pump under the positive pressure of 0.5-0.7 MPa. The prestressed pipeline grouting device has the effect of improving the prestressed pipeline grouting quality.
本申请公开了一种悬浇箱梁挂篮法施工方法,其包括如下步骤:S1、浇筑桥墩上端处的箱梁节段,S2、安装挂篮,S3、浇筑下一节箱梁节段,S4、挂篮前移以及管道压浆,S5、浇筑后续箱梁节段,S6、浇筑合拢段;在步骤S4中,采用真空辅助压浆工艺对预应力管道压浆,真空辅助压浆工艺为:先在预应力管道的出浆口采用真空泵抽吸预应力管道中的空气,使预应力管道内达到‑0.06‑0.1MPa的真空度,然后在预应力管道的压浆口用压浆泵以0.5‑0.7MPa的正压力将水泥浆压入管道内。本申请具有提高预应力管道压浆的质量的效果。
Hanging basket method construction method for suspended pouring box girder
一种悬浇箱梁挂篮法施工方法
OU QIONG (author) / JIANG JINBO (author) / XU CHENGSHUANG (author) / XU HUI (author) / XU HONG (author) / YANG YONGQIANG (author) / ZHOU HANG (author) / WU HAOHUA (author) / PU JUN (author) / LYU YONGGANG (author)
2022-08-16
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2023
|Hanging basket suspended casting structure and hanging basket suspended casting construction method
European Patent Office | 2023
|Limited space suspended pouring beam hanging basket construction safety channel system
European Patent Office | 2023
|