Construction method of cast-in-place concrete accelerator machine room
The invention relates to a construction method for a cast-in-place concrete accelerator machine room. The construction method comprises the following steps that firstly, paying-off positioning is conducted; secondly, vertical component steel bars are bound, and water and electricity pipelines are embedded; thirdly, two water stop steel plates are welded at the elevation of 4.2 m in an embedded mode; fourthly, the formworks are installed and fixed, and the formworks on the two sides abut against each other through an abutting device; 5, concealed acceptance check is conducted, concrete is poured to the 4.2 m position in a segmented mode, and a step-shaped construction joint is reserved; sixthly, the side walls and the vertical frameworks are maintained through an automatic spraying maintenance system; seventhly, a disc buckle type scaffold combined I-shaped steel keel supporting system is erected; 8, top plate reinforcing steel bars are bound, and water and electricity pipelines are embedded; ninthly, concealed acceptance check is conducted, and concrete is poured; tenthly, concrete is cured through the automatic spraying curing system; and eleventhly, the formwork and the supporting system are dismantled. According to the invention, the harm of high-energy electromagnetic radiation in the accelerator machine room to human bodies is reduced.
本申请涉及一种现浇混凝土加速器机房的施工方法,其包括如下步骤:步骤一:放线定位;步骤二:绑扎竖向构件钢筋预埋水电管线;步骤三:在标高4.2m处预埋焊接两个止水钢板;步骤四:安装固定模板,通过抵紧装置抵紧两侧的模板;步骤五:隐蔽验收、分段浇筑混凝土至4.2m处并留设阶梯型施工缝;步骤六:自动喷淋养护系统养护侧壁及竖向构架步骤七:架设盘扣式脚手架组合工字钢龙骨支撑系统;步骤八:绑扎顶板钢筋预埋水电管线;步骤九:隐蔽验收,浇筑混凝土;步骤十:自动喷淋养护系统养护混凝土;步骤十一:拆除模板及支撑系统。本申请减小了加速器机房内的高能电磁辐射对人体的伤害。
Construction method of cast-in-place concrete accelerator machine room
The invention relates to a construction method for a cast-in-place concrete accelerator machine room. The construction method comprises the following steps that firstly, paying-off positioning is conducted; secondly, vertical component steel bars are bound, and water and electricity pipelines are embedded; thirdly, two water stop steel plates are welded at the elevation of 4.2 m in an embedded mode; fourthly, the formworks are installed and fixed, and the formworks on the two sides abut against each other through an abutting device; 5, concealed acceptance check is conducted, concrete is poured to the 4.2 m position in a segmented mode, and a step-shaped construction joint is reserved; sixthly, the side walls and the vertical frameworks are maintained through an automatic spraying maintenance system; seventhly, a disc buckle type scaffold combined I-shaped steel keel supporting system is erected; 8, top plate reinforcing steel bars are bound, and water and electricity pipelines are embedded; ninthly, concealed acceptance check is conducted, and concrete is poured; tenthly, concrete is cured through the automatic spraying curing system; and eleventhly, the formwork and the supporting system are dismantled. According to the invention, the harm of high-energy electromagnetic radiation in the accelerator machine room to human bodies is reduced.
本申请涉及一种现浇混凝土加速器机房的施工方法,其包括如下步骤:步骤一:放线定位;步骤二:绑扎竖向构件钢筋预埋水电管线;步骤三:在标高4.2m处预埋焊接两个止水钢板;步骤四:安装固定模板,通过抵紧装置抵紧两侧的模板;步骤五:隐蔽验收、分段浇筑混凝土至4.2m处并留设阶梯型施工缝;步骤六:自动喷淋养护系统养护侧壁及竖向构架步骤七:架设盘扣式脚手架组合工字钢龙骨支撑系统;步骤八:绑扎顶板钢筋预埋水电管线;步骤九:隐蔽验收,浇筑混凝土;步骤十:自动喷淋养护系统养护混凝土;步骤十一:拆除模板及支撑系统。本申请减小了加速器机房内的高能电磁辐射对人体的伤害。
Construction method of cast-in-place concrete accelerator machine room
一种现浇混凝土加速器机房的施工方法
LIU LIULIAN (author) / ZHOU YUJUN (author) / QIU JIASEN (author) / OUYANG YUANFA (author) / CHEN ZICHENG (author) / LU JINGJIAN (author) / TIAN YULONG (author)
2022-08-30
Patent
Electronic Resource
Chinese
CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|Cast-in-place construction method of cast-in-place concrete bridge
European Patent Office | 2022
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
European Patent Office | 2019
|Cast-in-place construction method of cast-in-place concrete bridge
European Patent Office | 2021
|