A platform for research: civil engineering, architecture and urbanism
The invention relates to an asphalt pavement construction process and equipment, and relates to the field of road construction, and the asphalt pavement construction process comprises the following steps: preparation work: cleaning a construction pavement, and determining the type and technical requirements of paved asphalt; construction is started, and asphalt pavement construction equipment is placed on the construction pavement and debugged; pavement paving is conducted, specifically, an asphalt material is placed in asphalt pavement construction equipment, the asphalt pavement construction equipment comprises a stirring mechanism used for stirring the asphalt material, asphalt is paved on the pavement after being stirred, then the asphalt is repeatedly rolled through a reciprocating road rolling mechanism, and pavement asphalt construction is completed; and road maintenance: the constructed asphalt pavement is maintained, and construction is completed. The method has the effect of improving the construction efficiency of the asphalt pavement.
本申请涉及一种沥青路面施工工艺及设备,涉及道路施工的领域,其包括以下步骤:准备工作,对施工路面进行清洁处理并确定铺设沥青的种类和技术要求;开始施工,将沥青路面施工设备置于施工路面上并对沥青路面施工设备进行调试;铺设路面,将沥青材料置入沥青路面施工设备内,所述沥青路面施工设备包括用于对沥青材料进行搅拌的搅拌机构,沥青经过搅拌后铺洒到路面,之后通过往复压路机构对沥青进行反复碾压,完成对路面沥青的施工;道路维护,对施工完成后的沥青路面进行维护,完成施工。本申请具有提高沥青路面施工效率的效果。
The invention relates to an asphalt pavement construction process and equipment, and relates to the field of road construction, and the asphalt pavement construction process comprises the following steps: preparation work: cleaning a construction pavement, and determining the type and technical requirements of paved asphalt; construction is started, and asphalt pavement construction equipment is placed on the construction pavement and debugged; pavement paving is conducted, specifically, an asphalt material is placed in asphalt pavement construction equipment, the asphalt pavement construction equipment comprises a stirring mechanism used for stirring the asphalt material, asphalt is paved on the pavement after being stirred, then the asphalt is repeatedly rolled through a reciprocating road rolling mechanism, and pavement asphalt construction is completed; and road maintenance: the constructed asphalt pavement is maintained, and construction is completed. The method has the effect of improving the construction efficiency of the asphalt pavement.
本申请涉及一种沥青路面施工工艺及设备,涉及道路施工的领域,其包括以下步骤:准备工作,对施工路面进行清洁处理并确定铺设沥青的种类和技术要求;开始施工,将沥青路面施工设备置于施工路面上并对沥青路面施工设备进行调试;铺设路面,将沥青材料置入沥青路面施工设备内,所述沥青路面施工设备包括用于对沥青材料进行搅拌的搅拌机构,沥青经过搅拌后铺洒到路面,之后通过往复压路机构对沥青进行反复碾压,完成对路面沥青的施工;道路维护,对施工完成后的沥青路面进行维护,完成施工。本申请具有提高沥青路面施工效率的效果。
Asphalt pavement construction process and equipment
沥青路面施工工艺及设备
2022-09-02
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Asphalt pavement construction equipment and construction process thereof
European Patent Office | 2023
|