A platform for research: civil engineering, architecture and urbanism
The invention discloses a construction method for intelligent maintenance of a cast-in-place box girder in winter, and relates to the technical field of bridge engineering. According to the construction method for intelligent maintenance of the cast-in-place box girder in winter, a foundation and a flange plate are included, a PC end, a second temperature recorder, a humidity control instrument, a humidifier and a full framing are arranged on the foundation, a box girder bottom plate is arranged at the top of the full framing, and a web and a box chamber are arranged on the box girder bottom plate. According to the construction method for intelligent maintenance of the cast-in-place box girder in winter, a top heat preservation system, an inner temperature monitoring system and an outer temperature control system are arranged to record and collect data, the collected data are summarized to a PC terminal to be processed, and the effect of accurately adjusting the temperature of a box girder sealing body in real time is achieved; the temperature difference influence effect of the box girder in winter is reduced, the maintenance period of the box girder in winter is shortened, and integrated automatic intelligent maintenance of the cast-in-place box girder in winter is achieved.
本发明公开了一种现浇箱梁冬季智能化养护的施工方法,涉及桥梁工程技术领域。该现浇箱梁冬季智能化养护的施工方法,包括地基和翼缘板,所述地基上设置有PC端、2号温度记录仪、湿度控制仪、加湿器和满堂支架,所述满堂支架的顶部设置有箱梁底板,所述箱梁底板上设置有腹板和箱室。该现浇箱梁冬季智能化养护的施工方法,采用一种现浇箱梁冬季智能化养护的施工方法,通过设置顶部保温系统、内温监测系统、外温控制系统进行数据记录采集,并将采集数据汇总至PC端处理,达到实时准确调节箱梁密封体的温度效果,调节至在最佳养护温度,减少冬季箱梁温差影响效应,缩短冬季箱梁养护周期,实现现浇箱梁冬季一体化自动化智能养护。
The invention discloses a construction method for intelligent maintenance of a cast-in-place box girder in winter, and relates to the technical field of bridge engineering. According to the construction method for intelligent maintenance of the cast-in-place box girder in winter, a foundation and a flange plate are included, a PC end, a second temperature recorder, a humidity control instrument, a humidifier and a full framing are arranged on the foundation, a box girder bottom plate is arranged at the top of the full framing, and a web and a box chamber are arranged on the box girder bottom plate. According to the construction method for intelligent maintenance of the cast-in-place box girder in winter, a top heat preservation system, an inner temperature monitoring system and an outer temperature control system are arranged to record and collect data, the collected data are summarized to a PC terminal to be processed, and the effect of accurately adjusting the temperature of a box girder sealing body in real time is achieved; the temperature difference influence effect of the box girder in winter is reduced, the maintenance period of the box girder in winter is shortened, and integrated automatic intelligent maintenance of the cast-in-place box girder in winter is achieved.
本发明公开了一种现浇箱梁冬季智能化养护的施工方法,涉及桥梁工程技术领域。该现浇箱梁冬季智能化养护的施工方法,包括地基和翼缘板,所述地基上设置有PC端、2号温度记录仪、湿度控制仪、加湿器和满堂支架,所述满堂支架的顶部设置有箱梁底板,所述箱梁底板上设置有腹板和箱室。该现浇箱梁冬季智能化养护的施工方法,采用一种现浇箱梁冬季智能化养护的施工方法,通过设置顶部保温系统、内温监测系统、外温控制系统进行数据记录采集,并将采集数据汇总至PC端处理,达到实时准确调节箱梁密封体的温度效果,调节至在最佳养护温度,减少冬季箱梁温差影响效应,缩短冬季箱梁养护周期,实现现浇箱梁冬季一体化自动化智能养护。
Construction method for intelligent maintenance of cast-in-place box girder in winter
一种现浇箱梁冬季智能化养护的施工方法
2022-09-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Intelligent spraying maintenance system for cast-in-place box girder
European Patent Office | 2023
|Cast-in-place box girder support system and cast-in-place box girder construction method
European Patent Office | 2024
|