A platform for research: civil engineering, architecture and urbanism
Concrete winter construction maintenance equipment and construction method thereof
The invention discloses concrete winter construction curing equipment and a construction method thereof. The concrete winter construction curing equipment comprises a heat preservation cover, a concrete curing device and a concrete curing device, wherein the heat preservation cover is arranged outside a to-be-cured component in a covering mode; the heating device comprises a vortex tube and a heat conduction tube, the heat conduction tube is arranged on the inner side of the heat preservation cover and attached to the component to be maintained, the heat conduction tube is provided with an air outlet, the vortex tube is provided with a hot air end outlet, and the hot air end outlet is connected to the heat conduction tube; and the air compressor is connected to the vortex tube. The problem that fire disasters are prone to being caused by an existing heating maintenance method for concrete members constructed in winter is solved.
本发明公开了一种混凝土冬施养护设备及其施工方法,包括:用于罩设于待养护构件的外部的保温罩;升温装置,包括涡流管和导热管,所述导热管设置于所述保温罩的内侧且贴合于所述待养护构件,所述导热管开设有出气口,所述涡流管具有一热气端出口,所述热气端出口连接于所述导热管;以及空压机,连接于所述涡流管。本发明解决了现有的对冬季施工的混凝土构件的升温养护方法存在易引发火灾的问题。
Concrete winter construction maintenance equipment and construction method thereof
The invention discloses concrete winter construction curing equipment and a construction method thereof. The concrete winter construction curing equipment comprises a heat preservation cover, a concrete curing device and a concrete curing device, wherein the heat preservation cover is arranged outside a to-be-cured component in a covering mode; the heating device comprises a vortex tube and a heat conduction tube, the heat conduction tube is arranged on the inner side of the heat preservation cover and attached to the component to be maintained, the heat conduction tube is provided with an air outlet, the vortex tube is provided with a hot air end outlet, and the hot air end outlet is connected to the heat conduction tube; and the air compressor is connected to the vortex tube. The problem that fire disasters are prone to being caused by an existing heating maintenance method for concrete members constructed in winter is solved.
本发明公开了一种混凝土冬施养护设备及其施工方法,包括:用于罩设于待养护构件的外部的保温罩;升温装置,包括涡流管和导热管,所述导热管设置于所述保温罩的内侧且贴合于所述待养护构件,所述导热管开设有出气口,所述涡流管具有一热气端出口,所述热气端出口连接于所述导热管;以及空压机,连接于所述涡流管。本发明解决了现有的对冬季施工的混凝土构件的升温养护方法存在易引发火灾的问题。
Concrete winter construction maintenance equipment and construction method thereof
混凝土冬施养护设备及其施工方法
JIN KUO (author) / TAN KUN (author) / MENG LINGXIAO (author) / WANG QIAN (author) / YANG NING (author) / ZHANG YONG (author) / YU JIRUI (author) / FAN ZECHI (author) / SHANG TONG (author) / LIU DIANKUN (author)
2022-09-27
Patent
Electronic Resource
Chinese
Maintenance device for winter highway engineering construction concrete
European Patent Office | 2020
|European Patent Office | 2024
|Comprehensive maintenance method for winter construction of concrete box girder
European Patent Office | 2020
|Maintenance device for highway engineering construction concrete in winter
European Patent Office | 2022
|