Flood prevention combined module for water conservancy project
The invention discloses a water conservancy project flood prevention combined module, and belongs to the technical field of water conservancy project flood prevention. Every two adjacent flood prevention wall bodies are connected through a connecting piece to form a flood prevention dam; the flood prevention wall body comprises two anti-blocking side plates which are parallel to each other; an isolation plate is fixedly connected to the inner side of the anti-blocking side plate; the isolation plate on the inner side of one anti-blocking side plate is connected with the inner side of the other anti-blocking side plate; a first filling area is formed between the two isolation plates in the same flood control wall body; the first filling area is filled with a first filler; the connecting piece and the adjacent isolation plate form a second filling area; and the second filling area is filled with a second filler. The two flood prevention wall bodies are stably connected through the I-shaped connecting plate; the first filling area a and the second filling area b are filled, and convenient and efficient flood prevention is achieved; the second filling area b is filled with sandy soil, and the bottom of the first filling area a is filled with sandy soil to guarantee the waterproof effect; sandbags or square stones are laid on the sandy soil layer, stability is improved, and filling is facilitated.
本发明公开了一种水利工程防汛组合模块,属于水利工程防汛技术领域,本发明包括若干防汛墙体以及连接件;相邻两防汛墙体通过连接件连接形成防汛坝;防汛墙体包括两相互平行的防堵侧板;防堵侧板内侧固定连接有隔离板;一防堵侧板内侧的隔离板与另一防堵侧板内侧连接;同一防汛墙体内两隔离板之间形成第一填充区;第一填充区内填充第一填充物;连接件与相邻隔离板形成第二填充区;第二填充区内填充第二填充物。本发明通过工型连接板将两防汛墙体稳定连接;对第一填充区a以及第二填充区b进行填充,实现便捷高效的防汛;在第二填充区b内填充沙土,在第一填充区a底部填充沙土以保证防水效果;在沙土层上铺设沙袋或方石,提高稳定性以及便于填充。
Flood prevention combined module for water conservancy project
The invention discloses a water conservancy project flood prevention combined module, and belongs to the technical field of water conservancy project flood prevention. Every two adjacent flood prevention wall bodies are connected through a connecting piece to form a flood prevention dam; the flood prevention wall body comprises two anti-blocking side plates which are parallel to each other; an isolation plate is fixedly connected to the inner side of the anti-blocking side plate; the isolation plate on the inner side of one anti-blocking side plate is connected with the inner side of the other anti-blocking side plate; a first filling area is formed between the two isolation plates in the same flood control wall body; the first filling area is filled with a first filler; the connecting piece and the adjacent isolation plate form a second filling area; and the second filling area is filled with a second filler. The two flood prevention wall bodies are stably connected through the I-shaped connecting plate; the first filling area a and the second filling area b are filled, and convenient and efficient flood prevention is achieved; the second filling area b is filled with sandy soil, and the bottom of the first filling area a is filled with sandy soil to guarantee the waterproof effect; sandbags or square stones are laid on the sandy soil layer, stability is improved, and filling is facilitated.
本发明公开了一种水利工程防汛组合模块,属于水利工程防汛技术领域,本发明包括若干防汛墙体以及连接件;相邻两防汛墙体通过连接件连接形成防汛坝;防汛墙体包括两相互平行的防堵侧板;防堵侧板内侧固定连接有隔离板;一防堵侧板内侧的隔离板与另一防堵侧板内侧连接;同一防汛墙体内两隔离板之间形成第一填充区;第一填充区内填充第一填充物;连接件与相邻隔离板形成第二填充区;第二填充区内填充第二填充物。本发明通过工型连接板将两防汛墙体稳定连接;对第一填充区a以及第二填充区b进行填充,实现便捷高效的防汛;在第二填充区b内填充沙土,在第一填充区a底部填充沙土以保证防水效果;在沙土层上铺设沙袋或方石,提高稳定性以及便于填充。
Flood prevention combined module for water conservancy project
一种水利工程防汛组合模块
HUANG FENG (author) / WANG HAN (author) / WANG HONGXIA (author) / XU CHANG (author) / JIANG JUANJUAN (author)
2022-10-14
Patent
Electronic Resource
Chinese
Combined flood prevention box for water conservancy project
European Patent Office | 2024
|Flood prevention box for flood prevention of water conservancy project
European Patent Office | 2023
|