Elevator shaft hard protection synchronous installation construction method
The elevator shaft hard protection synchronous installation construction method comprises the following steps that S1, a floor formwork support is erected, a floor formwork is installed, and beam and slab steel bars are manufactured and installed; s2, a hole is formed in the elevator shaft body formwork of the floor, and a sleeve is installed in the hole; s3, an elevator shaft hard protection structure is installed in the elevator shaft body; and S4, floor beam plate concrete is poured. According to the elevator shaft hard protection synchronous installation construction method, the problem that practical and reliable hole protection measures cannot be set in the concrete structure construction process can be effectively solved, later dismantling is safe, simple and convenient, and the elevator shaft hard protection synchronous installation construction method can be used and popularized.
本申请公开一种电梯井硬防护同步安装施工方法,包括以下步骤:S1,搭设楼层支模架,并安装楼层模板和制作安装梁板钢筋;S2,在该楼层的电梯井筒体模板处开孔,并将套管安装至孔内;S3,在电梯井筒体内安装电梯井硬防护结构;S4,浇筑楼层梁板混凝土。本申请提供的电梯井硬防护同步安装施工方法,能有效解决混凝土结构施工过程中不能设置切实可靠的洞口防护措施的难题,而且后期拆除安全简单方便,可进行推广使用。
Elevator shaft hard protection synchronous installation construction method
The elevator shaft hard protection synchronous installation construction method comprises the following steps that S1, a floor formwork support is erected, a floor formwork is installed, and beam and slab steel bars are manufactured and installed; s2, a hole is formed in the elevator shaft body formwork of the floor, and a sleeve is installed in the hole; s3, an elevator shaft hard protection structure is installed in the elevator shaft body; and S4, floor beam plate concrete is poured. According to the elevator shaft hard protection synchronous installation construction method, the problem that practical and reliable hole protection measures cannot be set in the concrete structure construction process can be effectively solved, later dismantling is safe, simple and convenient, and the elevator shaft hard protection synchronous installation construction method can be used and popularized.
本申请公开一种电梯井硬防护同步安装施工方法,包括以下步骤:S1,搭设楼层支模架,并安装楼层模板和制作安装梁板钢筋;S2,在该楼层的电梯井筒体模板处开孔,并将套管安装至孔内;S3,在电梯井筒体内安装电梯井硬防护结构;S4,浇筑楼层梁板混凝土。本申请提供的电梯井硬防护同步安装施工方法,能有效解决混凝土结构施工过程中不能设置切实可靠的洞口防护措施的难题,而且后期拆除安全简单方便,可进行推广使用。
Elevator shaft hard protection synchronous installation construction method
电梯井硬防护同步安装施工方法
LUO YI (author) / HUANG HU (author) / LIANG HONG (author) / HU ZHIGANG (author) / LI PENGCHENG (author)
2022-10-21
Patent
Electronic Resource
Chinese
Elevator shaft operation protection platform and installation method
European Patent Office | 2022
|Rapid elevator shaft hard protection device and construction technology thereof
European Patent Office | 2021
|Construction method for renovating indoor elevator shaft installation
European Patent Office | 2023
|