Precast concrete pipe pile cap construction method
The invention discloses a precast concrete pipe pile cap construction method which comprises the following steps: firstly, preparing materials and instruments required to be used, and meanwhile, cleaning the ground; then, according to the size designed by a drawing, after measurement lofting and measurement are conducted on site through a measuring instrument, lime lines are scattered according to the measured position, later operation is facilitated, the concrete prefabricated pipe pile is sunken through a static pressure method or a hammering method, after the design requirement is met, the final pressure standard or the hammer closing control standard is met, and the construction efficiency is improved. Pile top earthwork is excavated, a cushion layer is constructed, manufactured pile cap reinforcing steel bars are placed in a pile core, the pile cap reinforcing steel bars and bottom plate reinforcing steel bars are connected, concrete is integrally poured, after the pile cap is constructed, the pile cap reinforcing steel bars and the bottom plate reinforcing steel bars are anchored, and the overall stability of the pile top of the pipe pile can be guaranteed; and the pile cap is constructed to reinforce the pile top of the tubular pile, so that the construction quality of the pile top can be ensured.
本发明公开了一种预制混凝土管桩桩帽施工方法,首先把所需要使用的材料和器械进行准备,同时对于地面进行清理;然后根据图纸设计的尺寸,通过测量仪在现场进行测量放样,测量后,根据测量的位置撒上白灰线,方便后期进行操作,本发明中混凝土预制管桩采用静压法或锤击法沉桩,达到设计按要求后,并且满足最终压力标准或收锤控制标准,开挖桩顶土方,施做垫层,将制作好的桩帽钢筋放入桩芯内,将桩帽钢筋与底板钢筋连接,整体浇筑混凝土,通过施做桩帽后,将桩帽钢筋与底板钢筋锚固,能保证管桩桩顶的整体稳定性;施做桩帽是对管桩桩顶的加强,能够保证桩顶的施工质量。
Precast concrete pipe pile cap construction method
The invention discloses a precast concrete pipe pile cap construction method which comprises the following steps: firstly, preparing materials and instruments required to be used, and meanwhile, cleaning the ground; then, according to the size designed by a drawing, after measurement lofting and measurement are conducted on site through a measuring instrument, lime lines are scattered according to the measured position, later operation is facilitated, the concrete prefabricated pipe pile is sunken through a static pressure method or a hammering method, after the design requirement is met, the final pressure standard or the hammer closing control standard is met, and the construction efficiency is improved. Pile top earthwork is excavated, a cushion layer is constructed, manufactured pile cap reinforcing steel bars are placed in a pile core, the pile cap reinforcing steel bars and bottom plate reinforcing steel bars are connected, concrete is integrally poured, after the pile cap is constructed, the pile cap reinforcing steel bars and the bottom plate reinforcing steel bars are anchored, and the overall stability of the pile top of the pipe pile can be guaranteed; and the pile cap is constructed to reinforce the pile top of the tubular pile, so that the construction quality of the pile top can be ensured.
本发明公开了一种预制混凝土管桩桩帽施工方法,首先把所需要使用的材料和器械进行准备,同时对于地面进行清理;然后根据图纸设计的尺寸,通过测量仪在现场进行测量放样,测量后,根据测量的位置撒上白灰线,方便后期进行操作,本发明中混凝土预制管桩采用静压法或锤击法沉桩,达到设计按要求后,并且满足最终压力标准或收锤控制标准,开挖桩顶土方,施做垫层,将制作好的桩帽钢筋放入桩芯内,将桩帽钢筋与底板钢筋连接,整体浇筑混凝土,通过施做桩帽后,将桩帽钢筋与底板钢筋锚固,能保证管桩桩顶的整体稳定性;施做桩帽是对管桩桩顶的加强,能够保证桩顶的施工质量。
Precast concrete pipe pile cap construction method
一种预制混凝土管桩桩帽施工方法
MA YANGUANG (author) / YUAN XIKUI (author) / WANG KUN (author) / ZHANG JING (author) / HUANG YANGYANG (author) / LI HENG (author)
2022-10-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Building concrete pipe pile precast pile enclosure structure construction system
European Patent Office | 2024
|Precast concrete pipe pile core sealing device and construction method
European Patent Office | 2024
|European Patent Office | 2020
|