A platform for research: civil engineering, architecture and urbanism
The invention discloses a construction system for a building concrete pipe pile precast pile enclosure structure, and belongs to the technical field of construction of building soil pipe pile precast pile enclosure structures. Comprising a man-machine control module, a worker can carry out general control on other modules, data communication between a PLC and the man-machine control module and between the PLC and a sensor module is achieved through the Ethernet, a precast pile can be placed through a machine, a sensor is arranged in a conveying pipe, and changes of displacement and force are obtained; the storage module can store permissible data of machinery, the man-machine control module can use the permissible data to control the execution module, through arrangement of the construction precast pile execution module and the system, continuous construction of precast piles is conducted through system control equipment, the automation degree can be improved, waste of manpower and material resources can be reduced, and the construction efficiency is improved. Meanwhile, potential safety hazards in the construction process can be reduced.
本申请公开了一种建筑混凝土管桩预制桩围护结构施工系统,属于建筑土管桩预制桩围护结构施工技术领域;包括人机控制模块,可以让工作人员对其他模块进行总控,通过以太网实现PLC与人机控制模块和传感器模块的数据通信,可以通过机械对预制桩进行放置等动作,在输送管内设置传感器,对位移及力度进行的变化进行获取,所述存储模块可以对机械的允许数据进行储存,供人机控制模块使用控制执行模块,通过施工预制桩执行模块及系统的设置,从而通过系统控制设备进行连续对预制桩进行施工,不仅可以提高自动化程度,而且可以减少人力物力的浪费,同时可以减少施工过程中的安全隐患。
The invention discloses a construction system for a building concrete pipe pile precast pile enclosure structure, and belongs to the technical field of construction of building soil pipe pile precast pile enclosure structures. Comprising a man-machine control module, a worker can carry out general control on other modules, data communication between a PLC and the man-machine control module and between the PLC and a sensor module is achieved through the Ethernet, a precast pile can be placed through a machine, a sensor is arranged in a conveying pipe, and changes of displacement and force are obtained; the storage module can store permissible data of machinery, the man-machine control module can use the permissible data to control the execution module, through arrangement of the construction precast pile execution module and the system, continuous construction of precast piles is conducted through system control equipment, the automation degree can be improved, waste of manpower and material resources can be reduced, and the construction efficiency is improved. Meanwhile, potential safety hazards in the construction process can be reduced.
本申请公开了一种建筑混凝土管桩预制桩围护结构施工系统,属于建筑土管桩预制桩围护结构施工技术领域;包括人机控制模块,可以让工作人员对其他模块进行总控,通过以太网实现PLC与人机控制模块和传感器模块的数据通信,可以通过机械对预制桩进行放置等动作,在输送管内设置传感器,对位移及力度进行的变化进行获取,所述存储模块可以对机械的允许数据进行储存,供人机控制模块使用控制执行模块,通过施工预制桩执行模块及系统的设置,从而通过系统控制设备进行连续对预制桩进行施工,不仅可以提高自动化程度,而且可以减少人力物力的浪费,同时可以减少施工过程中的安全隐患。
Building concrete pipe pile precast pile enclosure structure construction system
一种建筑混凝土管桩预制桩围护结构施工系统
YE WENJUN (author)
2024-02-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete precast pile and connecting structure of concrete precast pile
European Patent Office | 2021
|Building concrete precast pile trestle
Engineering Index Backfile | 1947