A platform for research: civil engineering, architecture and urbanism
The invention discloses a trapezoidal ditch pouring mold capable of rapidly pouring, which comprises two assembly plates, first channel steel, second channel steel and a first connecting strip, the two assembly plates are both placed in a pre-dug groove, the two assembly plates are both obliquely arranged from top to bottom, the two assembly plates are respectively close to two side walls of the groove, and the first channel steel and the second channel steel are connected through the first connecting strip. The sides, close to the side walls of the grooves, of the assembling plates are smooth planes, a plurality of first steel channels are arranged at the tops of the assembling plates, the first steel channels on the two assembling plates are in one-to-one correspondence, notches of the first steel channels are clamped at the top ends of the assembling plates, horizontally-arranged second steel channels are fixed to the first steel channels, the second steel channels are horizontally arranged, and the notches of the second steel channels face upwards. And a first connecting strip is arranged between the corresponding first channel steel on the two assembling plates. The two assembling plates are fixed through the first channel steel, the second channel steel and the first connecting strip, so that the mold structure becomes simple and stable, and pouring is convenient.
本发明公开了一种可快速浇注的梯形水沟浇注模具,包括组装板、第一槽钢、第二槽钢、第一连接条,所述组装板有两块,两块组装板均放置在预先挖好的沟槽内,两块组装板均自上向下倾斜设置,两块组装板分别靠近沟槽的两个侧壁,组装板的靠近沟槽侧壁侧为光滑的平面,所述组装板的顶部设有若干个第一槽钢,两块组装板上的第一槽钢一一对应,第一槽钢的槽口卡在组装板的顶端,所述第一槽钢上固定有水平设置的第二槽钢,第二槽钢水平设置且槽口向上,两块组装板上相对应的第一槽钢之间设有一根第一连接条。本发明通过第一槽钢、第二槽钢、第一连接条将两块组装板固定,使得模具结构变得简单而稳定,且便于进行浇注。
The invention discloses a trapezoidal ditch pouring mold capable of rapidly pouring, which comprises two assembly plates, first channel steel, second channel steel and a first connecting strip, the two assembly plates are both placed in a pre-dug groove, the two assembly plates are both obliquely arranged from top to bottom, the two assembly plates are respectively close to two side walls of the groove, and the first channel steel and the second channel steel are connected through the first connecting strip. The sides, close to the side walls of the grooves, of the assembling plates are smooth planes, a plurality of first steel channels are arranged at the tops of the assembling plates, the first steel channels on the two assembling plates are in one-to-one correspondence, notches of the first steel channels are clamped at the top ends of the assembling plates, horizontally-arranged second steel channels are fixed to the first steel channels, the second steel channels are horizontally arranged, and the notches of the second steel channels face upwards. And a first connecting strip is arranged between the corresponding first channel steel on the two assembling plates. The two assembling plates are fixed through the first channel steel, the second channel steel and the first connecting strip, so that the mold structure becomes simple and stable, and pouring is convenient.
本发明公开了一种可快速浇注的梯形水沟浇注模具,包括组装板、第一槽钢、第二槽钢、第一连接条,所述组装板有两块,两块组装板均放置在预先挖好的沟槽内,两块组装板均自上向下倾斜设置,两块组装板分别靠近沟槽的两个侧壁,组装板的靠近沟槽侧壁侧为光滑的平面,所述组装板的顶部设有若干个第一槽钢,两块组装板上的第一槽钢一一对应,第一槽钢的槽口卡在组装板的顶端,所述第一槽钢上固定有水平设置的第二槽钢,第二槽钢水平设置且槽口向上,两块组装板上相对应的第一槽钢之间设有一根第一连接条。本发明通过第一槽钢、第二槽钢、第一连接条将两块组装板固定,使得模具结构变得简单而稳定,且便于进行浇注。
Trapezoidal ditch pouring mold capable of achieving rapid pouring
一种可快速浇注的梯形水沟浇注模具
LU PING (author)
2022-11-01
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Ship loading bucket capable of achieving rapid material pouring
European Patent Office | 2023
|Integral mold pouring machine and method for highway tunnel sewage ditch
European Patent Office | 2020
|European Patent Office | 2024
|