A platform for research: civil engineering, architecture and urbanism
Cast-in-situ bored pile reinforcement cage forming quality control construction method
The invention provides a cast-in-situ bored pile reinforcement cage forming quality control construction method. The cast-in-situ bored pile reinforcement cage forming quality control construction method comprises the steps of deepening design, main reinforcement and stirrup limiting device manufacturing, main reinforcement limiting device installation and adjustment, main reinforcement installation and reinforcing rib welding, stirrup limiting device adjustment and installation, stirrup installation and welding, reinforcement cage manufacturing completion and the like. The method solves the problem that the cast-in-situ bored pile stirrup is prone to desoldering, the one-time forming quality of the reinforcement cage can be greatly improved, the possibility of later reworking is reduced, the on-site construction progress is guaranteed, and meanwhile the requirement for the bearing capacity of the cast-in-situ bored pile meeting the design requirement is met.
本发明提供一种钻孔灌注桩钢筋笼成型质量控制施工方法,包括深化设计、主筋、箍筋限位装置制作、主筋限位装置安装及调节、主筋安装及加强筋焊接、箍筋限位装置调节及安装、箍筋安装及焊接、钢筋笼制作完成等步骤。本发明解决了钻孔灌注桩箍筋易脱焊的问题,可大大提高钢筋笼的一次成型质量,减少后期返工的可能,保证了现场的施工进度,同时也达到了设计要求的钻孔灌注桩承载能力要求。
Cast-in-situ bored pile reinforcement cage forming quality control construction method
The invention provides a cast-in-situ bored pile reinforcement cage forming quality control construction method. The cast-in-situ bored pile reinforcement cage forming quality control construction method comprises the steps of deepening design, main reinforcement and stirrup limiting device manufacturing, main reinforcement limiting device installation and adjustment, main reinforcement installation and reinforcing rib welding, stirrup limiting device adjustment and installation, stirrup installation and welding, reinforcement cage manufacturing completion and the like. The method solves the problem that the cast-in-situ bored pile stirrup is prone to desoldering, the one-time forming quality of the reinforcement cage can be greatly improved, the possibility of later reworking is reduced, the on-site construction progress is guaranteed, and meanwhile the requirement for the bearing capacity of the cast-in-situ bored pile meeting the design requirement is met.
本发明提供一种钻孔灌注桩钢筋笼成型质量控制施工方法,包括深化设计、主筋、箍筋限位装置制作、主筋限位装置安装及调节、主筋安装及加强筋焊接、箍筋限位装置调节及安装、箍筋安装及焊接、钢筋笼制作完成等步骤。本发明解决了钻孔灌注桩箍筋易脱焊的问题,可大大提高钢筋笼的一次成型质量,减少后期返工的可能,保证了现场的施工进度,同时也达到了设计要求的钻孔灌注桩承载能力要求。
Cast-in-situ bored pile reinforcement cage forming quality control construction method
一种钻孔灌注桩钢筋笼成型质量控制施工方法
CHEN GANG (author) / PAN PENGCHAO (author) / XIAO HAN (author) / QUAN YOUWEI (author) / LI JUNWEN (author) / JIANG HAO (author) / WANG GAIGE (author) / QI QINGPENG (author)
2022-11-08
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|Construction method of reinforcement cage of cast-in-situ bored pile
European Patent Office | 2023
|European Patent Office | 2015
|Cast-in-situ bored pile reinforcement cage hoisting device
European Patent Office | 2024
|