Blocking and reinforcing protection construction method for defective diaphragm wall under water-rich silt stratum
The invention provides a construction method for blocking and reinforcing protection of a defective diaphragm wall under a water-rich silt stratum. The construction method comprises the steps of backfilling and back pressing of the defective diaphragm wall, drilling and coring of the defective diaphragm wall, MJS construction method pile construction, additional arrangement of a supporting enclosing purlin, cleaning of the defective diaphragm wall, blocking of a steel plate, concrete pouring, observation of foundation pit leakage, understanding of monitoring data conditions and the like. In the blocking and reinforcing protection construction of the defective diaphragm wall, the enclosing purlins are additionally arranged, the blocking steel plates are adopted for rapid blocking, and the MJS construction method and other technologies are combined, so that a set of key construction technology is formed.
本发明提供一种富水粉砂地层下缺陷地连墙封堵及补强保护施工方法,包括缺陷地连墙回土反压、缺陷地连墙钻孔取芯、MJS工法桩施工、增设支撑围檩、清理缺陷地连墙,钢板封堵,浇筑混凝土、观察基坑渗漏及了解监测数据情况等步骤。本发明在缺陷地连墙封堵及补强保护施工中,增设围檩,采用封堵钢板快速封堵,结合MJS工法等技术,形成一套关键施工技术。
Blocking and reinforcing protection construction method for defective diaphragm wall under water-rich silt stratum
The invention provides a construction method for blocking and reinforcing protection of a defective diaphragm wall under a water-rich silt stratum. The construction method comprises the steps of backfilling and back pressing of the defective diaphragm wall, drilling and coring of the defective diaphragm wall, MJS construction method pile construction, additional arrangement of a supporting enclosing purlin, cleaning of the defective diaphragm wall, blocking of a steel plate, concrete pouring, observation of foundation pit leakage, understanding of monitoring data conditions and the like. In the blocking and reinforcing protection construction of the defective diaphragm wall, the enclosing purlins are additionally arranged, the blocking steel plates are adopted for rapid blocking, and the MJS construction method and other technologies are combined, so that a set of key construction technology is formed.
本发明提供一种富水粉砂地层下缺陷地连墙封堵及补强保护施工方法,包括缺陷地连墙回土反压、缺陷地连墙钻孔取芯、MJS工法桩施工、增设支撑围檩、清理缺陷地连墙,钢板封堵,浇筑混凝土、观察基坑渗漏及了解监测数据情况等步骤。本发明在缺陷地连墙封堵及补强保护施工中,增设围檩,采用封堵钢板快速封堵,结合MJS工法等技术,形成一套关键施工技术。
Blocking and reinforcing protection construction method for defective diaphragm wall under water-rich silt stratum
一种富水粉砂地层下缺陷地连墙封堵及补强保护施工方法
CHEN GANG (author) / CHU CHUNBO (author) / XIAO HAN (author) / QUAN YOUWEI (author) / ZHAO SHUWEI (author)
2022-11-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Water-rich silt weak formation underground diaphragm wall construction method
European Patent Office | 2020
|Underground water construction method for water-rich silt stratum
European Patent Office | 2024
|Construction method for water-rich silt layer diaphragm wall precipitation auxiliary grooving
European Patent Office | 2023
|