A platform for research: civil engineering, architecture and urbanism
Prefabricated drainage structure for municipal road and construction method thereof
The invention relates to the technical field of municipal road construction, in particular to a prefabricated assembly type drainage structure for municipal roads and a construction method thereof.The construction method comprises the following steps that S1, all components are prefabricated, specifically, a main pit, a drainage pipe gallery, a water collection pit and matched accessory components are prefabricated in a factory; s2, a drainage pipe gallery is excavated on the construction site; s3, a main drain well, a water collecting drain well and a drainage pipe gallery are sequentially placed, and the main drain well and the water collecting drain well are communicated through the drainage pipe gallery; s4, a ditch cover and road edge stones are installed; s5, placing an inspection well; s6, a drainage groove is constructed; s7, the main pit well, the water collecting pit well and the drainage pipe gallery are buried in the roadbed, and pavement hardening is conducted. The construction period of the road drainage structure can be shortened, and the construction efficiency is improved.
本申请涉及市政道路建设的技术领域,尤其是涉及预制装配式市政道路用排水结构及其施工方法,包括以下步骤:S1、预制各构件:在工厂预制主阴井、排水管廊、集水阴井及配套的附属构件;S2、在施工现场开挖排水管廊渠;S3、依次安放主阴井、集水阴井及排水管廊,用排水管廊将主阴井和集水阴井进行连通;S4、安装水沟盖和路沿石;S5、安放检查井;S6、施作排水槽;S7、将主阴井、集水阴井及排水管廊埋于路基内,进行路面硬化,本申请能够缩短道路排水结构的施工周期,提高施工效率。
Prefabricated drainage structure for municipal road and construction method thereof
The invention relates to the technical field of municipal road construction, in particular to a prefabricated assembly type drainage structure for municipal roads and a construction method thereof.The construction method comprises the following steps that S1, all components are prefabricated, specifically, a main pit, a drainage pipe gallery, a water collection pit and matched accessory components are prefabricated in a factory; s2, a drainage pipe gallery is excavated on the construction site; s3, a main drain well, a water collecting drain well and a drainage pipe gallery are sequentially placed, and the main drain well and the water collecting drain well are communicated through the drainage pipe gallery; s4, a ditch cover and road edge stones are installed; s5, placing an inspection well; s6, a drainage groove is constructed; s7, the main pit well, the water collecting pit well and the drainage pipe gallery are buried in the roadbed, and pavement hardening is conducted. The construction period of the road drainage structure can be shortened, and the construction efficiency is improved.
本申请涉及市政道路建设的技术领域,尤其是涉及预制装配式市政道路用排水结构及其施工方法,包括以下步骤:S1、预制各构件:在工厂预制主阴井、排水管廊、集水阴井及配套的附属构件;S2、在施工现场开挖排水管廊渠;S3、依次安放主阴井、集水阴井及排水管廊,用排水管廊将主阴井和集水阴井进行连通;S4、安装水沟盖和路沿石;S5、安放检查井;S6、施作排水槽;S7、将主阴井、集水阴井及排水管廊埋于路基内,进行路面硬化,本申请能够缩短道路排水结构的施工周期,提高施工效率。
Prefabricated drainage structure for municipal road and construction method thereof
预制装配式市政道路用排水结构及其施工方法
ZHUANG LIXUAN (author) / ZHUANG CAISHAN (author) / ZHUANG RUILUAN (author)
2022-11-22
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Municipal road drainage structure and construction method thereof
European Patent Office | 2024
|Municipal road drainage structure and construction method thereof
European Patent Office | 2024
|