A platform for research: civil engineering, architecture and urbanism
Construction structure and construction method of bubble mixed light soil retaining wall
The construction structure comprises a fixing frame arranged in a foundation pit, the fixing frame is slidably connected with a first sliding seat, the first sliding seat can slide relative to the fixing frame in the length direction of the fixing frame, and a second sliding seat is slidably arranged on the first sliding seat; a bearing seat is arranged on the second sliding seat in a liftable mode, a working platform is rotationally arranged on the bearing seat, a prefabricated panel is arranged on the working platform, an overturning assembly used for driving the working platform to overturn is arranged on the bearing seat, a movable frame is arranged on the working platform in a sliding mode, and a clamping plate used for clamping the prefabricated panel is arranged on the movable frame in a liftable mode; the movable frame is provided with a clamping assembly used for driving the clamping plate to ascend and descend relative to the working platform so that the clamping plate can be matched with the working platform to clamp the prefabricated panel. The construction method has the effects that construction of the retaining wall is rapidly completed, the labor intensity of constructors is reduced, and the construction progress is accelerated.
本申请涉及一种气泡混合轻质土挡墙的施工结构及其施工方法,包括设置于基坑内固定架,固定架上滑移连接有第一滑移座,第一滑移座能够相对固定架沿固定架的长度方向滑移,第一滑移座上滑移设置有第二滑移座,第二滑移座上可升降设置承载座,承载座上转动设置有工作平台,工作平台上设置有预制面板,承载座上设置有用于驱动工作平台翻转的翻转组件,工作平台上滑移设置有移动架,移动架可升降设置有用于夹紧预制面板的夹板,移动架上设置有用于驱动夹板相对工作平台升降,以令夹板与工作平台配合将预制面板夹紧的夹紧组件。本申请具有快速完成挡墙的施工,降低施工人员的劳动强度,加快施工进度的效果。
Construction structure and construction method of bubble mixed light soil retaining wall
The construction structure comprises a fixing frame arranged in a foundation pit, the fixing frame is slidably connected with a first sliding seat, the first sliding seat can slide relative to the fixing frame in the length direction of the fixing frame, and a second sliding seat is slidably arranged on the first sliding seat; a bearing seat is arranged on the second sliding seat in a liftable mode, a working platform is rotationally arranged on the bearing seat, a prefabricated panel is arranged on the working platform, an overturning assembly used for driving the working platform to overturn is arranged on the bearing seat, a movable frame is arranged on the working platform in a sliding mode, and a clamping plate used for clamping the prefabricated panel is arranged on the movable frame in a liftable mode; the movable frame is provided with a clamping assembly used for driving the clamping plate to ascend and descend relative to the working platform so that the clamping plate can be matched with the working platform to clamp the prefabricated panel. The construction method has the effects that construction of the retaining wall is rapidly completed, the labor intensity of constructors is reduced, and the construction progress is accelerated.
本申请涉及一种气泡混合轻质土挡墙的施工结构及其施工方法,包括设置于基坑内固定架,固定架上滑移连接有第一滑移座,第一滑移座能够相对固定架沿固定架的长度方向滑移,第一滑移座上滑移设置有第二滑移座,第二滑移座上可升降设置承载座,承载座上转动设置有工作平台,工作平台上设置有预制面板,承载座上设置有用于驱动工作平台翻转的翻转组件,工作平台上滑移设置有移动架,移动架可升降设置有用于夹紧预制面板的夹板,移动架上设置有用于驱动夹板相对工作平台升降,以令夹板与工作平台配合将预制面板夹紧的夹紧组件。本申请具有快速完成挡墙的施工,降低施工人员的劳动强度,加快施工进度的效果。
Construction structure and construction method of bubble mixed light soil retaining wall
一种气泡混合轻质土挡墙的施工结构及其施工方法
WANG LINCHENG (author) / SHAN XIANG (author) / WANG SHAOPENG (author) / ZHANG YINGHONG (author) / MAO HONGJIAN (author) / HE QINGHUA (author) / JIA SHUAIBING (author) / WANG GUIYU (author) / MENG QING (author) / ZHANG JILIN (author)
2022-11-25
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|European Patent Office | 2023
|SOIL RETAINING WALL CONSTRUCTION METHOD AND SOIL RETAINING WALL CONSTRUCTED BY THIS
European Patent Office | 2019