A platform for research: civil engineering, architecture and urbanism
Integral structure of steel frame-combined steel plate shear wall structure and construction method thereof
The invention discloses an integral structure of a steel frame-combined steel plate shear wall structure and a construction method of the integral structure. The integral structure comprises supporting steel columns, a steel frame dome structure connected to the upper portions of the supporting steel columns, roof steel plates connected into the steel frame dome structure and shear walls connected between the supporting steel columns. According to the steel frame dome structure, the steel frame dome structure is divided, the connection position distribution of the steel frame and the truss in the structure is defined, and the division and zoning basis is provided for later installation and hoisting; the steel frame dome structure is of a special-shaped structure, the trusses and the steel frames are mostly arranged in an arc shape or a double-curvature shape, the edge-closing trusses provide modeling and lateral supporting foundations for the whole structure, and the arc-shaped trusses are beneficial to being used in a middle large-span building space; through the arrangement of the separation units and the separation truss belts, local reinforcement under the wave curvature change is facilitated; and during construction, the steel frame is constructed in advance, and the truss butt joint notches are reserved, so that effective mounting and hoisting of the dome structure are facilitated.
本发明公开了一种钢框架‑组合钢板剪力墙结构整体结构及其施工方法,整体结构包含支撑钢柱、连接于支撑钢柱上方的钢架穹顶结构、连接于钢架穹顶结构内的屋面钢板以及连接于支撑钢柱之间的剪力墙。本发明通过将钢架穹顶结构进行划分,明确了结构中钢架和桁架的连接位置分布,为以后的安装和吊装提供分部和分区依据;钢架穹顶结构为异形结构,且桁架与钢架均多为弧形或双曲率设置,收边桁架为整个结构提供了造型和侧向支撑基础,弧形桁架在利于中部大跨度建筑空间的使用;通过分隔单元和分隔桁架带的设置,利于在波浪曲度变化下进行局部加固;通过施工时将钢架预先施工且留有桁架对接缺口,利于穹顶结构的有效安装和吊装。
Integral structure of steel frame-combined steel plate shear wall structure and construction method thereof
The invention discloses an integral structure of a steel frame-combined steel plate shear wall structure and a construction method of the integral structure. The integral structure comprises supporting steel columns, a steel frame dome structure connected to the upper portions of the supporting steel columns, roof steel plates connected into the steel frame dome structure and shear walls connected between the supporting steel columns. According to the steel frame dome structure, the steel frame dome structure is divided, the connection position distribution of the steel frame and the truss in the structure is defined, and the division and zoning basis is provided for later installation and hoisting; the steel frame dome structure is of a special-shaped structure, the trusses and the steel frames are mostly arranged in an arc shape or a double-curvature shape, the edge-closing trusses provide modeling and lateral supporting foundations for the whole structure, and the arc-shaped trusses are beneficial to being used in a middle large-span building space; through the arrangement of the separation units and the separation truss belts, local reinforcement under the wave curvature change is facilitated; and during construction, the steel frame is constructed in advance, and the truss butt joint notches are reserved, so that effective mounting and hoisting of the dome structure are facilitated.
本发明公开了一种钢框架‑组合钢板剪力墙结构整体结构及其施工方法,整体结构包含支撑钢柱、连接于支撑钢柱上方的钢架穹顶结构、连接于钢架穹顶结构内的屋面钢板以及连接于支撑钢柱之间的剪力墙。本发明通过将钢架穹顶结构进行划分,明确了结构中钢架和桁架的连接位置分布,为以后的安装和吊装提供分部和分区依据;钢架穹顶结构为异形结构,且桁架与钢架均多为弧形或双曲率设置,收边桁架为整个结构提供了造型和侧向支撑基础,弧形桁架在利于中部大跨度建筑空间的使用;通过分隔单元和分隔桁架带的设置,利于在波浪曲度变化下进行局部加固;通过施工时将钢架预先施工且留有桁架对接缺口,利于穹顶结构的有效安装和吊装。
Integral structure of steel frame-combined steel plate shear wall structure and construction method thereof
一种钢框架-组合钢板剪力墙结构整体结构及其施工方法
ZHANG HONGWEI (author) / LI MIN (author) / LIU FANGXING (author) / SHI JING (author) / HAO HAILONG (author) / GU YANG (author) / LU XIN (author)
2022-11-25
Patent
Electronic Resource
Chinese
Assembled integral steel plate combined shear wall and construction method thereof
European Patent Office | 2020
|Assembled integral multi-cavity steel plate combined shear wall and construction method thereof
European Patent Office | 2020
|Fabricated combined frame steel plate shear wall and assembling method thereof
European Patent Office | 2023
|