Construction method of retaining wall between vertical piles of side slope
The invention relates to the technical field of retaining wall construction, in particular to a construction method of a retaining wall between side slope upright piles. The method has the advantages that due to the fact that the one-time excavation depth is not large, split item projects with large dangerousness can be avoided, and the project safety risk is reduced; the method belongs to step-by-step excavation and step-by-step supporting, long-time exposure of surrounding rocks is avoided, and the surrounding rock deformation risk is reduced; the single-cycle construction period is short, the environmental factors on construction are small, and the construction progress can be guaranteed; the excavation depth of each time is small, the excavation amount can be controlled, and the influence of geological factors is small; the procedure of temporary protection or supporting is removed, the construction period is shortened, and the construction cost is reduced; the working procedures of excavation, steel bar planting, steel bar binding, formwork installation and concrete pouring can be overlapped in order, the working efficiency is improved, and compared with a common construction method, various types of work and working procedures can be achieved. The method is controllable in construction progress, simple in construction process and balanced in one-time personnel and machine investment, the cost can be effectively controlled, and the construction period is guaranteed.
本发明涉及挡墙施工技术领域,尤其涉及一种边坡直立桩间挡土墙施工方法;本发明具有由于一次性开挖深度不大,可以避免产生危险性较大的分部分项工程,降低工程安全风险;该方法属于逐步开挖、逐步支护,避免围岩长时间暴露,减少围岩变形风险;单次循环施工周期短,施工受环境因素小,施工进度能够保证;每次开挖深度小,能够控制开挖量,受地质因素影响小;去除临时防护或支护的工序,缩短施工周期、降低施工成本;开挖、植筋、绑扎钢筋、模板安装和混凝土浇筑各道工序可以有序搭接,提高工作效率,较普通施工方法能够使各工种、工序。该方法施工进度可控,施工工艺简单,一次性人员、机械投入均衡,能够有效控制成本、保证工期。
Construction method of retaining wall between vertical piles of side slope
The invention relates to the technical field of retaining wall construction, in particular to a construction method of a retaining wall between side slope upright piles. The method has the advantages that due to the fact that the one-time excavation depth is not large, split item projects with large dangerousness can be avoided, and the project safety risk is reduced; the method belongs to step-by-step excavation and step-by-step supporting, long-time exposure of surrounding rocks is avoided, and the surrounding rock deformation risk is reduced; the single-cycle construction period is short, the environmental factors on construction are small, and the construction progress can be guaranteed; the excavation depth of each time is small, the excavation amount can be controlled, and the influence of geological factors is small; the procedure of temporary protection or supporting is removed, the construction period is shortened, and the construction cost is reduced; the working procedures of excavation, steel bar planting, steel bar binding, formwork installation and concrete pouring can be overlapped in order, the working efficiency is improved, and compared with a common construction method, various types of work and working procedures can be achieved. The method is controllable in construction progress, simple in construction process and balanced in one-time personnel and machine investment, the cost can be effectively controlled, and the construction period is guaranteed.
本发明涉及挡墙施工技术领域,尤其涉及一种边坡直立桩间挡土墙施工方法;本发明具有由于一次性开挖深度不大,可以避免产生危险性较大的分部分项工程,降低工程安全风险;该方法属于逐步开挖、逐步支护,避免围岩长时间暴露,减少围岩变形风险;单次循环施工周期短,施工受环境因素小,施工进度能够保证;每次开挖深度小,能够控制开挖量,受地质因素影响小;去除临时防护或支护的工序,缩短施工周期、降低施工成本;开挖、植筋、绑扎钢筋、模板安装和混凝土浇筑各道工序可以有序搭接,提高工作效率,较普通施工方法能够使各工种、工序。该方法施工进度可控,施工工艺简单,一次性人员、机械投入均衡,能够有效控制成本、保证工期。
Construction method of retaining wall between vertical piles of side slope
一种边坡直立桩间挡土墙施工方法
SU CHANGHUI (author) / CUI YONGZHI (author) / WANG GUANYING (author) / YE YU (author) / ZHANG XUEMIN (author) / QIAO SHIFAN (author) / LONG JIAO (author) / LIU HONGBIN (author) / ZHANG HONGXING (author) / YANG WEIHUA (author)
2022-11-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Fabricated retaining wall structure for highway construction side slope
European Patent Office | 2024
|Method for supporting construction formwork of retaining wall between piles
European Patent Office | 2024
|Influence of Vertical Piles to Support Retaining Wall
British Library Conference Proceedings | 2000
|