A platform for research: civil engineering, architecture and urbanism
Leakage-proof inspection well and construction process thereof
The invention discloses a leakage-proof inspection well and a construction process thereof, and relates to the technical field of inspection wells. The leakage-proof inspection well comprises a bottom plate fixedly arranged on the ground, and an annular groove is formed in the upper surface of the bottom plate; the elevator shaft comprises a plurality of supporting rings, the number of the supporting rings is multiple, the supporting rings are distributed in an up-down overlapping mode, each supporting ring comprises a plurality of building blocks which are mutually spliced end to end, U-shaped sleeve blocks which can be mutually connected in a clamped mode are arranged at the two ends of each building block, and inserting grooves are formed in the tops of the building blocks. The connecting frame is spliced in the supporting ring to form a main body part of the inspection well, the building blocks and the connecting frame are prefabricated parts, the building blocks and the connecting frame can be formed only by assembling and matching with a small amount of cement during installation, construction operation is convenient and fast, the construction period is short, the construction efficiency is greatly improved, the sealing performance can be improved through clamping connection between the U-shaped sleeve blocks, and the service life of the inspection well is prolonged. And water leakage is prevented.
本发明公开了防漏型检查井及其施工工艺,涉及检查井技术领域。本发明防漏型检查井包括:底板,固设在地面上,所述底板上表面构造有环形槽;支撑环,数量为多个且呈上下叠加分布,所述支撑环包括多个首位相互拼接的砌块,所述砌块两端均构造有可相互卡接的U型套块,所述砌块顶部均构造有插槽,本发明通过多个砌块拼接成支撑环,再通过多个支撑环拼接成一个整体的井道,将连接框拼接在支撑环内,以形成检查井的主体部分,砌块与连接框均为预制构件,在安装时只需要装配,并配合少量的水泥即可成型,施工操作便捷,并且施工周期较短,大大提高了施工效率,并且U型套块之间的卡接设置,可以提高密封性,防止漏水。
Leakage-proof inspection well and construction process thereof
The invention discloses a leakage-proof inspection well and a construction process thereof, and relates to the technical field of inspection wells. The leakage-proof inspection well comprises a bottom plate fixedly arranged on the ground, and an annular groove is formed in the upper surface of the bottom plate; the elevator shaft comprises a plurality of supporting rings, the number of the supporting rings is multiple, the supporting rings are distributed in an up-down overlapping mode, each supporting ring comprises a plurality of building blocks which are mutually spliced end to end, U-shaped sleeve blocks which can be mutually connected in a clamped mode are arranged at the two ends of each building block, and inserting grooves are formed in the tops of the building blocks. The connecting frame is spliced in the supporting ring to form a main body part of the inspection well, the building blocks and the connecting frame are prefabricated parts, the building blocks and the connecting frame can be formed only by assembling and matching with a small amount of cement during installation, construction operation is convenient and fast, the construction period is short, the construction efficiency is greatly improved, the sealing performance can be improved through clamping connection between the U-shaped sleeve blocks, and the service life of the inspection well is prolonged. And water leakage is prevented.
本发明公开了防漏型检查井及其施工工艺,涉及检查井技术领域。本发明防漏型检查井包括:底板,固设在地面上,所述底板上表面构造有环形槽;支撑环,数量为多个且呈上下叠加分布,所述支撑环包括多个首位相互拼接的砌块,所述砌块两端均构造有可相互卡接的U型套块,所述砌块顶部均构造有插槽,本发明通过多个砌块拼接成支撑环,再通过多个支撑环拼接成一个整体的井道,将连接框拼接在支撑环内,以形成检查井的主体部分,砌块与连接框均为预制构件,在安装时只需要装配,并配合少量的水泥即可成型,施工操作便捷,并且施工周期较短,大大提高了施工效率,并且U型套块之间的卡接设置,可以提高密封性,防止漏水。
Leakage-proof inspection well and construction process thereof
防漏型检查井及其施工工艺
MA XIANGNAN (author) / MA BINXUE (author) / WANG JIGUANG (author) / TANG DONGYI (author) / MA YINUO (author)
2022-11-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Leakage-proof ceramic tile and preparation process thereof
European Patent Office | 2023
|