A platform for research: civil engineering, architecture and urbanism
Construction method of pollution discharge shear wall of livestock farm
The invention discloses a construction method of a pollution discharge shear wall of a livestock farm, which belongs to the technical field of shear wall construction treatment and comprises the following steps: step 1, preparation before construction: prefabricating a template according to +/-0.00, step 2, popping up an axis and a wall body line, and popping up a template supporting auxiliary line which is 500 mm away from the wall body line, step 3, binding reinforcing steel bars according to a drawing and specifications, and step 4, carrying out construction. The method comprises the following steps of 1, template control, 2, template thickness control, 3, template flatness control, 4, template thickness control, 5, template flatness control, 6, reinforcement control and 7, seam allowance treatment. According to the construction method for the pollution discharge shear wall of the farm, in the construction process, the construction precision can be guaranteed by cleaning, positioning and calibrating the construction position, in the subsequent use process, dislocation stress is prevented from being generated, the pressure resistance of the wall body is prevented from being reduced, the tensile strength is prevented from being reduced due to external stress points, and the prefabricated support is combined, so that the construction cost is reduced. The pouring quality can be guaranteed, and the structural strength of cement and aggregate is improved.
本发明公开了一种养殖场排污剪力墙施工方法,属于剪力墙施工处理技术领域,包括以下步骤:步骤一、施工前准备:模板按照±0.00平预制模板,步骤二、弹好轴线及墙身线,并弹出墙身线偏500mm的支模辅助线,步骤三、钢筋按照图纸及规范绑扎,步骤四、模板厚度控制,步骤五、模板平整度控制,步骤六、加固控制,步骤七、子口处理。该养殖场排污剪力墙施工方法,在施工的过程中,通过对施工位置进行清洁、定位和校准,可保证施工精度,且在后续的使用过程中,避免产生错位应力,导致产生墙体的抗压能力下降,避免外部受力点使得抗拉性下降,且结合预制支撑,可以保证浇筑的质量,提高水泥和骨料的结构强度。
Construction method of pollution discharge shear wall of livestock farm
The invention discloses a construction method of a pollution discharge shear wall of a livestock farm, which belongs to the technical field of shear wall construction treatment and comprises the following steps: step 1, preparation before construction: prefabricating a template according to +/-0.00, step 2, popping up an axis and a wall body line, and popping up a template supporting auxiliary line which is 500 mm away from the wall body line, step 3, binding reinforcing steel bars according to a drawing and specifications, and step 4, carrying out construction. The method comprises the following steps of 1, template control, 2, template thickness control, 3, template flatness control, 4, template thickness control, 5, template flatness control, 6, reinforcement control and 7, seam allowance treatment. According to the construction method for the pollution discharge shear wall of the farm, in the construction process, the construction precision can be guaranteed by cleaning, positioning and calibrating the construction position, in the subsequent use process, dislocation stress is prevented from being generated, the pressure resistance of the wall body is prevented from being reduced, the tensile strength is prevented from being reduced due to external stress points, and the prefabricated support is combined, so that the construction cost is reduced. The pouring quality can be guaranteed, and the structural strength of cement and aggregate is improved.
本发明公开了一种养殖场排污剪力墙施工方法,属于剪力墙施工处理技术领域,包括以下步骤:步骤一、施工前准备:模板按照±0.00平预制模板,步骤二、弹好轴线及墙身线,并弹出墙身线偏500mm的支模辅助线,步骤三、钢筋按照图纸及规范绑扎,步骤四、模板厚度控制,步骤五、模板平整度控制,步骤六、加固控制,步骤七、子口处理。该养殖场排污剪力墙施工方法,在施工的过程中,通过对施工位置进行清洁、定位和校准,可保证施工精度,且在后续的使用过程中,避免产生错位应力,导致产生墙体的抗压能力下降,避免外部受力点使得抗拉性下降,且结合预制支撑,可以保证浇筑的质量,提高水泥和骨料的结构强度。
Construction method of pollution discharge shear wall of livestock farm
一种养殖场排污剪力墙施工方法
YANG GUANGYANG (author) / WANG ZHENYU (author) / RONG SHIJIN (author)
2022-11-29
Patent
Electronic Resource
Chinese
Shear wall construction method, building construction method, shear wall and building
European Patent Office | 2020
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
European Patent Office | 2021
|Fixing rib for shear wall, shear wall and construction method of shear wall
European Patent Office | 2023
|