Shear wall construction method, building construction method, shear wall and building
The invention relates to the technical field of shear wall construction, in particular to a shear wall construction method, a building construction method, a shear wall and a building. The shear wallconstruction method, the building construction method, the shear wall and the building are designed for solving the problem of low construction efficiency. The shear wall construction method comprisesa first fish plate welding step and a hoisting step, wherein the hoisting step is carried out after the first fish plate welding step; and in the first fish plate welding step, an anti-buckling steelplate is welded to first fish plates, second fish plates, third fish plates and fourth fish plates, the first fish plates and the second fish plates are arranged on the two side faces of the top of the anti-buckling steel plate in pairs, and the third fish plates and the fourth fish plates are arranged on the two side faces of the bottom of the anti-buckling steel plate in pairs. According to theshear wall construction method, the construction speed of a construction site is increased, the welding proportion of overhead welding operation with high welding quality defects is reduced, and theoverall welding quality can be improved.
本发明涉及剪力墙的施工技术领域,尤其是涉及一种剪力墙施工方法、建筑物建造方法、剪力墙和建筑物,为解决施工效率低的问题而设计。剪力墙施工方法包括鱼尾板第一焊接步骤和吊装步骤,吊装步骤位于鱼尾板第一焊接步骤之后,鱼尾板第一焊接步骤中,将防屈曲钢板与第一鱼尾板、第二鱼尾板、第三鱼尾板和第四鱼尾板焊接,第一鱼尾板和第二鱼尾板成对设置在防屈曲钢板的顶部的两侧面,第三鱼尾板和第四鱼尾板成对设置在防屈曲钢板的底部的两侧面。本发明提供的剪力墙施工方法提高了施工现场的施工速度,降低了仰焊操作这种出现焊接质量缺陷较高的焊接比例,也可以提高总体的焊接质量。
Shear wall construction method, building construction method, shear wall and building
The invention relates to the technical field of shear wall construction, in particular to a shear wall construction method, a building construction method, a shear wall and a building. The shear wallconstruction method, the building construction method, the shear wall and the building are designed for solving the problem of low construction efficiency. The shear wall construction method comprisesa first fish plate welding step and a hoisting step, wherein the hoisting step is carried out after the first fish plate welding step; and in the first fish plate welding step, an anti-buckling steelplate is welded to first fish plates, second fish plates, third fish plates and fourth fish plates, the first fish plates and the second fish plates are arranged on the two side faces of the top of the anti-buckling steel plate in pairs, and the third fish plates and the fourth fish plates are arranged on the two side faces of the bottom of the anti-buckling steel plate in pairs. According to theshear wall construction method, the construction speed of a construction site is increased, the welding proportion of overhead welding operation with high welding quality defects is reduced, and theoverall welding quality can be improved.
本发明涉及剪力墙的施工技术领域,尤其是涉及一种剪力墙施工方法、建筑物建造方法、剪力墙和建筑物,为解决施工效率低的问题而设计。剪力墙施工方法包括鱼尾板第一焊接步骤和吊装步骤,吊装步骤位于鱼尾板第一焊接步骤之后,鱼尾板第一焊接步骤中,将防屈曲钢板与第一鱼尾板、第二鱼尾板、第三鱼尾板和第四鱼尾板焊接,第一鱼尾板和第二鱼尾板成对设置在防屈曲钢板的顶部的两侧面,第三鱼尾板和第四鱼尾板成对设置在防屈曲钢板的底部的两侧面。本发明提供的剪力墙施工方法提高了施工现场的施工速度,降低了仰焊操作这种出现焊接质量缺陷较高的焊接比例,也可以提高总体的焊接质量。
Shear wall construction method, building construction method, shear wall and building
剪力墙施工方法、建筑物建造方法、剪力墙和建筑物
ZHANG AILIN (author) / SU LEI (author) / CAO ZHILIANG (author) / PU SHUANGHUI (author) / ZHANG XIAOLIN (author)
2020-08-07
Patent
Electronic Resource
Chinese
Frame shear wall building and construction method thereof
European Patent Office | 2021
|Shear wall cantilever reinforcing structure, construction method and building construction method
European Patent Office | 2021
|Fabricated shear wall building structure and construction method thereof
European Patent Office | 2023
|Fabricated shear wall building structure and construction method thereof
European Patent Office | 2021
|Fabricated shear wall building structure and construction method thereof
European Patent Office | 2023
|