The invention discloses a staggered joint reservoir dam anti-seepage reinforcement construction method, which relates to the technical field of dam construction, and comprises the steps of S1 concrete slab preparation, S2 joint plate preparation, S3 concrete slab preparation with holes, S4 data measurement, S5 module number confirmation, S6 dam construction and S7 gauge pile driving. The concrete plate, the joint plate and the concrete plate with the holes are all produced through molds, so that the outer concrete plate, the joint plate and the concrete plate with the holes can be prepared before dam construction, construction workers only need to lay corresponding plate blocks to designated sites, cement mortar is smeared on the plate blocks, and then dam anti-seepage reinforcing construction can be achieved; compared with traditional direct pouring on the dam body, the method has the advantages that dam construction can be completed more quickly, meanwhile, the influence of weather factors is small, and in addition, due to the waterproof effect of cooperative use of the concrete slabs and the joint plates, it can be guaranteed that the engineering quality is equivalent to that of a plurality of layers of concrete poured on the dam body.
本发明公开了一种错位接缝的水库大坝防渗加固施工方法,涉及大坝施工技术领域,包括S1混凝土板制备、S2接缝板制备、S3带孔混凝土板制备、S4数据测量、S5确认模块数量、S6大坝施工和S7定位桩打入。本发明混凝土板、接缝板以及带孔混凝土板均采用模具生产,这使得外混凝土板、接缝板以及带孔混凝土板均可在大坝施工前准备完毕,施工工人只需将对应的板块铺设至指定位点,并涂抹上水泥砂浆后即可实现大坝防渗加固施工,相较于传统的直接在大坝坝体上浇筑,本方法能够更快速的完成大坝施工,同时受天气因素的影响较小,此外得益于混凝土板和接缝板配合使用的防水效果,亦可保证工程质量与大坝坝体上浇筑复数层混凝土相当。
The invention discloses a staggered joint reservoir dam anti-seepage reinforcement construction method, which relates to the technical field of dam construction, and comprises the steps of S1 concrete slab preparation, S2 joint plate preparation, S3 concrete slab preparation with holes, S4 data measurement, S5 module number confirmation, S6 dam construction and S7 gauge pile driving. The concrete plate, the joint plate and the concrete plate with the holes are all produced through molds, so that the outer concrete plate, the joint plate and the concrete plate with the holes can be prepared before dam construction, construction workers only need to lay corresponding plate blocks to designated sites, cement mortar is smeared on the plate blocks, and then dam anti-seepage reinforcing construction can be achieved; compared with traditional direct pouring on the dam body, the method has the advantages that dam construction can be completed more quickly, meanwhile, the influence of weather factors is small, and in addition, due to the waterproof effect of cooperative use of the concrete slabs and the joint plates, it can be guaranteed that the engineering quality is equivalent to that of a plurality of layers of concrete poured on the dam body.
本发明公开了一种错位接缝的水库大坝防渗加固施工方法,涉及大坝施工技术领域,包括S1混凝土板制备、S2接缝板制备、S3带孔混凝土板制备、S4数据测量、S5确认模块数量、S6大坝施工和S7定位桩打入。本发明混凝土板、接缝板以及带孔混凝土板均采用模具生产,这使得外混凝土板、接缝板以及带孔混凝土板均可在大坝施工前准备完毕,施工工人只需将对应的板块铺设至指定位点,并涂抹上水泥砂浆后即可实现大坝防渗加固施工,相较于传统的直接在大坝坝体上浇筑,本方法能够更快速的完成大坝施工,同时受天气因素的影响较小,此外得益于混凝土板和接缝板配合使用的防水效果,亦可保证工程质量与大坝坝体上浇筑复数层混凝土相当。
Seepage-proofing reinforcement construction method for reservoir dam with staggered joints
一种错位接缝的水库大坝防渗加固施工方法
HE XUEYUN (author)
2022-12-02
Patent
Electronic Resource
Chinese
Seepage-proofing structure of sewage pipeline and construction method of seepage-proofing structure
European Patent Office | 2022
|Construction method of water plant pool wall seepage-proofing system and seepage-proofing system
European Patent Office | 2024
|