Fabricated steel structure frame and concrete composite structure house wall construction method
The invention relates to the technical field of building construction, in particular to a fabricated steel structure frame and concrete composite structure house wall construction method. The heat preservation plate is prefabricated in a concrete prefabricated wallboard, a concrete outer acanthus is arranged on the outer side of the concrete prefabricated wallboard, a concrete inner acanthus is arranged on the inner side of the concrete prefabricated wallboard, pouring is conducted on the interior of the concrete inner acanthus, a prefabricated floor slab is laid on a horizontal steel beam at the same height, and cement mortar is laid on the prefabricated floor slab for blocking. And then pouring is conducted, the concrete outer acanthus is subjected to structural waterproofing at the joint position, polystyrene rods are filled in the gaps, and sealant is applied to the outermost side. During on-site assembly, the construction time is saved, installation is convenient, the installation cost is reduced, and the concrete steel columns and the horizontal steel beams can provide effective vertical support and better horizontal deformation resistance.
本发明涉及建筑施工技术领域,具体是一种装配式钢结构框架及混凝土组合结构住宅墙体施工方法。将保温板预制在混凝土预制墙板中,混凝土预制墙板外侧设置有混凝土外叶板,混凝土预制墙板内侧设置有混凝土内叶板,对混凝土内叶板内部进行浇筑,将预制楼板铺设在同一高度的水平钢梁上,预制楼板上铺设有水泥砂浆进行封堵,然后进行浇筑,混凝土外叶板在接缝部位做构造防水,缝隙处填塞聚苯乙烯棒,最外侧打密封胶。在现场拼装的时候节省施工时间,便于安装,降低安装成本,并且混凝土钢柱和水平钢梁能提供有效的竖向支撑和较佳的水平抗变形能力。
Fabricated steel structure frame and concrete composite structure house wall construction method
The invention relates to the technical field of building construction, in particular to a fabricated steel structure frame and concrete composite structure house wall construction method. The heat preservation plate is prefabricated in a concrete prefabricated wallboard, a concrete outer acanthus is arranged on the outer side of the concrete prefabricated wallboard, a concrete inner acanthus is arranged on the inner side of the concrete prefabricated wallboard, pouring is conducted on the interior of the concrete inner acanthus, a prefabricated floor slab is laid on a horizontal steel beam at the same height, and cement mortar is laid on the prefabricated floor slab for blocking. And then pouring is conducted, the concrete outer acanthus is subjected to structural waterproofing at the joint position, polystyrene rods are filled in the gaps, and sealant is applied to the outermost side. During on-site assembly, the construction time is saved, installation is convenient, the installation cost is reduced, and the concrete steel columns and the horizontal steel beams can provide effective vertical support and better horizontal deformation resistance.
本发明涉及建筑施工技术领域,具体是一种装配式钢结构框架及混凝土组合结构住宅墙体施工方法。将保温板预制在混凝土预制墙板中,混凝土预制墙板外侧设置有混凝土外叶板,混凝土预制墙板内侧设置有混凝土内叶板,对混凝土内叶板内部进行浇筑,将预制楼板铺设在同一高度的水平钢梁上,预制楼板上铺设有水泥砂浆进行封堵,然后进行浇筑,混凝土外叶板在接缝部位做构造防水,缝隙处填塞聚苯乙烯棒,最外侧打密封胶。在现场拼装的时候节省施工时间,便于安装,降低安装成本,并且混凝土钢柱和水平钢梁能提供有效的竖向支撑和较佳的水平抗变形能力。
Fabricated steel structure frame and concrete composite structure house wall construction method
装配式钢结构框架及混凝土组合结构住宅墙体施工方法
HAO FULI (author) / ZHU BINBIN (author) / CHANG BIN (author)
2022-12-13
Patent
Electronic Resource
Chinese
Fabricated concrete frame structure farm house construction method
European Patent Office | 2023
|Prefabricated steel frame and concrete composite wall column combined fabricated structure
European Patent Office | 2024
|Construction method of portal rigid frame of fabricated steel-concrete composite structure
European Patent Office | 2024
|Fabricated steel-concrete composite structure construction method
European Patent Office | 2024
|Fabricated steel frame composite light wall house building
European Patent Office | 2021
|