A platform for research: civil engineering, architecture and urbanism
Construction system suitable for trestle and construction method thereof
The invention relates to a construction system suitable for a trestle and a construction method of the construction system. The construction system comprises floating transportation equipment; the construction platform is supported on the floating transportation equipment, the construction platform comprises a truss, and the truss is provided with a plurality of guide sleeves; the pile driving equipment is arranged on the construction platform, and after the pipe piles are inserted into the corresponding guide sleeves, the pile driving equipment drives the pipe piles into a rock stratum; the drilling device is arranged on the construction platform, and the drilling device is used for drilling holes in the tubular pile to form a pouring channel; and the pouring device is arranged on the construction platform, and the pouring device is used for pouring concrete into the pouring channel to form an anchor pile buried in a rock stratum. The positioning efficiency of the pipe piles can be improved, and the relative position precision between the pipe piles can be improved.
本发明涉及一种适用于栈桥的施工系统及其施工方法,施工系统包括:浮运设备;施工平台,所述施工平台支撑于所述浮运设备上,所述施工平台包括桁架,所述桁架设有若干导向套管;打桩设备,所述打桩设备设置于所述施工平台上,当管桩插入对应的导向套管后,所述打桩设备将所述管桩打入岩层;钻孔装置,所述钻孔装置设置于所述施工平台上,所述钻孔装置用于向所述管桩钻孔形成浇筑通道;浇筑装置,所述浇筑装置设于所述施工平台上,所述浇筑装置用于向所述浇筑通道内浇筑混凝土形成埋于岩层的锚桩。可以提高对管桩定位的效率并提高管桩之间的相对位置精度。
Construction system suitable for trestle and construction method thereof
The invention relates to a construction system suitable for a trestle and a construction method of the construction system. The construction system comprises floating transportation equipment; the construction platform is supported on the floating transportation equipment, the construction platform comprises a truss, and the truss is provided with a plurality of guide sleeves; the pile driving equipment is arranged on the construction platform, and after the pipe piles are inserted into the corresponding guide sleeves, the pile driving equipment drives the pipe piles into a rock stratum; the drilling device is arranged on the construction platform, and the drilling device is used for drilling holes in the tubular pile to form a pouring channel; and the pouring device is arranged on the construction platform, and the pouring device is used for pouring concrete into the pouring channel to form an anchor pile buried in a rock stratum. The positioning efficiency of the pipe piles can be improved, and the relative position precision between the pipe piles can be improved.
本发明涉及一种适用于栈桥的施工系统及其施工方法,施工系统包括:浮运设备;施工平台,所述施工平台支撑于所述浮运设备上,所述施工平台包括桁架,所述桁架设有若干导向套管;打桩设备,所述打桩设备设置于所述施工平台上,当管桩插入对应的导向套管后,所述打桩设备将所述管桩打入岩层;钻孔装置,所述钻孔装置设置于所述施工平台上,所述钻孔装置用于向所述管桩钻孔形成浇筑通道;浇筑装置,所述浇筑装置设于所述施工平台上,所述浇筑装置用于向所述浇筑通道内浇筑混凝土形成埋于岩层的锚桩。可以提高对管桩定位的效率并提高管桩之间的相对位置精度。
Construction system suitable for trestle and construction method thereof
一种适用于栈桥的施工系统及其施工方法
MAO WEIQI (author) / ZHOU GONGJIAN (author) / ZHAO HU (author) / LYU LEI (author) / TU MANMING (author) / HUANG TING (author) / WANG DONGHUI (author) / YAO FAHAI (author) / WANG YANFENG (author) / LI YONGQI (author)
2022-12-20
Patent
Electronic Resource
Chinese
Temporary construction trestle suitable for mucky area and construction method
European Patent Office | 2022
|Multifunctional trestle construction method suitable for thick pebble bed
European Patent Office | 2021
|